Playa Solar 2 power plant, Nevada

Playa Solar 2 is a 100 MW solar power plant in Clark County, Nevada, operated by EDF Renewable Asset Holdings, Inc., and it generated 255,099 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.6% of the generation reported in Nevada, and its capacity factor sits at the 87th percentile of U.S. solar plants. By 2025 generation it ranks 2,197th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

100 MWNameplate capacity
29%Capacity factor, 2025, 87th percentile, on 100 MW net summer
0.6%Of NV generation, 2025
8 yearsAverage generator age, by MW

How hard does the Playa Solar 2 plant run compared with other solar plants?

The Playa Solar 2 plant had a capacity factor of 29% in 2025 on 100 MW of net summer capacity, the 87th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 106 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Playa Solar 229%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Playa Solar 2 plant generating more or less than last year?

Generation at Playa Solar 2 rose 3.3% from 2024 to 2025, from 246,910 MWh to 255,099 MWh. Through August 2026 it is running 1.0% behind the same months of 2025.

Net generation by period
PeriodMWh
2024246,910
2025255,099
2026 through August187,705
2025, same months189,579
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202623,131
July 202626,136
June 202629,698
May 202630,928
April 202627,204
March 202622,448
February 202615,467
January 202612,693
December 202511,421
November 202512,296
October 202520,101
September 202521,702
August 202526,009
July 202529,818
June 202530,522
May 202526,722
April 202523,820
March 202521,434
February 202516,694
January 202514,560
December 202411,777
November 202414,067
October 202417,646
September 202421,822
August 202426,247
July 202427,743
June 202428,082
May 202429,627
April 202426,104
March 202418,612
February 20249,966
January 202415,217

Source: EIA Form EIA-923, through August 2026.

How much of Nevada's electricity comes from the Playa Solar 2 plant?

Playa Solar 2 made 0.6% of the 45,180,066 MWh reported by Nevada plants in 2025, from 0.5% of the state's 18,959 MW of capacity. By capacity it is the 41st largest of 117 plants in Nevada, the 2,602nd largest of 14,327 in the U.S. and the 434th largest of 7,223 solar plants. By 2025 generation it is the 41st largest of 112 generating plants in the state.

Playa Solar 2 within Nevada, 2025
MeasureThis plantNevadaShare
Capacity (MW)10018,9590.5%
Generation (MWh)255,09945,180,0660.6%
Solar capacity (MW)1005,1951.9%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Playa Solar 2 plant, and when do they retire?

1 operable generator totals 100 MW, with an average age of 8 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s1100100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GEN1OperatingSolar Photovoltaic1002017n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Playa Solar 2 plant?

EIA lists no joint owners for Playa Solar 2. EDF Renewable Asset Holdings, Inc. operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Playa Solar 2 plant?

Playa Solar 2 is in North Las Vegas, Clark County, Nevada, at 36.4080° N, 114.9080° W. It sits in the Nevada Power Company balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Nevada are similar in size?

Nevada has 58 operable solar plants with 5,195 MW of capacity, and Playa Solar 2's 100 MW is 2% of that.

Solar plants in Nevada around this size
PlantCountyMW2025 MWh
Yellow Pine IIClark125388,585
Sunshine Valley SolarNye104264,140
Battle Mountain Solar ProjectHumboldt101274,057
Playa Solar 2Clark100255,099
Boulder Solar Power, LLCClark100275,123
Techren Solar I LLCClark100224,064
Harry Allen Solar Energy LLCClark100296,941