Solar power plant, Nevada

Battle Mountain Solar Project, Nevada

Battle Mountain Solar Project is a 126 MW power plant, 101 MW of it solar, in Humboldt County, Nevada, operated by RWE Clean Energy, and it generated 271,917 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.6% of the generation reported in Nevada, and its capacity factor sits at the 94th percentile of U.S. solar plants. By 2025 generation it ranks 2,099th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

126 MWNameplate capacity
31%Capacity factor, 2025, solar units, 94th percentile, on 101 MW net summer
0.6%Of NV generation, 2025
4 yearsAverage generator age, by MW

How hard does the Battle Mountain Solar Project plant run compared with other solar plants?

The Battle Mountain Solar Project plant's solar units had a capacity factor of 31% in 2025 on 101 MW of net summer capacity, the 94th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 113 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Battle Mountain Solar Project31%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the Battle Mountain Solar Project plant generating more or less than last year?

Generation at Battle Mountain Solar Project fell 6.2% from 2024 to 2025, from 289,761 MWh to 271,917 MWh. Through August 2026 it is running 2.2% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024289,761
2025271,917
2026 through August212,088
2025, same months207,516
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202628,356
July 202633,385
June 202634,054
May 202632,334
April 202627,752
March 202623,495
February 202619,514
January 202613,198
December 20258,935
November 202513,127
October 202519,121
September 202523,218
August 202530,670
July 202535,036
June 202535,924
May 202531,860
April 202527,716
March 202519,497
February 202514,262
January 202512,551
December 20249,916
November 202411,249
October 202433,426
September 202425,879
August 202435,629
July 202433,853
June 202433,729
May 202434,332
April 202428,337
March 202420,597
February 202413,757
January 20249,057

Source: EIA Form EIA-923, through August 2026.

How much of Nevada's electricity comes from the Battle Mountain Solar Project plant?

Battle Mountain Solar Project made 0.6% of the 45,180,066 MWh reported by Nevada plants in 2025, from 0.7% of the state's 18,959 MW of capacity. By capacity it is the 35th largest of 117 plants in Nevada, the 2,255th largest of 14,327 in the U.S. and the 425th largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 38th largest of 112 generating plants in the state.

Battle Mountain Solar Project within Nevada, 2025
MeasureThis plantNevadaShare
Capacity (MW)12618,9590.7%
Generation (MWh)271,91745,180,0660.6%
Solar capacity (MW)1015,1951.9%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Battle Mountain Solar Project plant, and when do they retire?

2 operable generators total 126 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s2126100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
BMBSOperatingBatteries252021n/a
BMSPOperatingSolar Photovoltaic1012021n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Battle Mountain Solar Project plant?

EIA lists no joint owners for Battle Mountain Solar Project. RWE Clean Energy operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Battle Mountain Solar Project plant use?

Battle Mountain Solar Project has capacity on 2 fuels: 80% solar and 20% battery and pumped storage. In 2025, solar made 101% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar10180.2%274,057
Battery and pumped storage2519.8%-2,140

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Battle Mountain Solar Project plant?

Battle Mountain Solar Project is in Battle Mountain, Humboldt County, Nevada, at 40.7184° N, 117.0614° W. It sits in the Nevada Power Company balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Nevada are similar in size?

Nevada has 58 operable solar plants with 5,195 MW of capacity, and Battle Mountain Solar Project's 101 MW is 2% of that.

Solar plants in Nevada around this size
PlantCountyMW2025 MWh
Yellow Pine SolarClark125387,833
Yellow Pine IIClark125388,585
Sunshine Valley SolarNye104264,140
Battle Mountain Solar ProjectHumboldt101274,057
Playa Solar 2Clark100255,099
Boulder Solar Power, LLCClark100275,123
Techren Solar I LLCClark100224,064

Source: EIA Forms EIA-860 and EIA-923, 2025.