Solar power plant, Nevada

Yellow Pine Solar power plant, Nevada

Yellow Pine Solar is a 190 MW power plant, 125 MW of it solar, in Clark County, Nevada, operated by Yellow Pine Solar, LLC, and it generated 376,251 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.8% of the generation reported in Nevada, and its capacity factor sits at the 100th percentile of U.S. solar plants. By 2025 generation it ranks 1,672nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

190 MWNameplate capacity
47%Capacity factor, 2025, solar units, 100th percentile, on 93.8 MW net summer
0.8%Of NV generation, 2025
2 yearsAverage generator age, by MW

How hard does the Yellow Pine Solar plant run compared with other solar plants?

The Yellow Pine Solar plant's solar units had a capacity factor of 47% in 2025 on 93.8 MW of net summer capacity, the 100th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 172 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Yellow Pine Solar47%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the Yellow Pine Solar plant generating more or less than last year?

Generation at Yellow Pine Solar fell 1.3% from 2024 to 2025, from 381,017 MWh to 376,251 MWh. Through August 2026 it is running 3.3% behind the same months of 2025.

Net generation by period
PeriodMWh
2024381,017
2025376,251
2026 through August268,098
2025, same months277,189
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202636,502
July 202637,338
June 202639,205
May 202641,767
April 202633,327
March 202634,900
February 202623,283
January 202621,776
December 202518,775
November 202519,373
October 202527,954
September 202532,960
August 202538,010
July 202542,557
June 202541,373
May 202539,446
April 202536,038
March 202530,747
February 202525,158
January 202523,860
December 202419,654
November 202423,540
October 202431,350
September 202435,176
August 202440,163
July 202441,335
June 202442,824
May 202445,798
April 202437,794
March 202426,230
February 202420,135
January 202417,018

Source: EIA Form EIA-923, through August 2026.

How much of Nevada's electricity comes from the Yellow Pine Solar plant?

Yellow Pine Solar made 0.8% of the 45,180,066 MWh reported by Nevada plants in 2025, from 1.0% of the state's 18,959 MW of capacity. By capacity it is the 31st largest of 117 plants in Nevada, the 1,696th largest of 14,327 in the U.S. and the 369th largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 28th largest of 112 generating plants in the state.

Yellow Pine Solar within Nevada, 2025
MeasureThis plantNevadaShare
Capacity (MW)19018,9591.0%
Generation (MWh)376,25145,180,0660.8%
Solar capacity (MW)1255,1952.4%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Yellow Pine Solar plant, and when do they retire?

2 operable generators total 190 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s2190100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
YPESOperatingBatteries652023n/a
YPS1OperatingSolar Photovoltaic1252023n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Yellow Pine Solar plant?

EIA lists no joint owners for Yellow Pine Solar. Yellow Pine Solar, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Yellow Pine Solar plant use?

Yellow Pine Solar has capacity on 2 fuels: 66% solar and 34% battery and pumped storage. In 2025, solar made 103% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar12565.8%387,833
Battery and pumped storage6534.2%-11,582

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Yellow Pine Solar plant?

Yellow Pine Solar is in Enterprise, Clark County, Nevada, at 36.0663° N, 115.7751° W. It sits in the Nevada Power Company balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Nevada are similar in size?

Nevada has 58 operable solar plants with 5,195 MW of capacity, and Yellow Pine Solar's 125 MW is 2% of that.

Solar plants in Nevada around this size
PlantCountyMW2025 MWh
Copper Mountain Solar 2Clark154726,034
Dry Lake Solar Energy CenterClark150378,908
Crescent Dunes Solar EnergyNye12558,997
Yellow Pine SolarClark125387,833
Yellow Pine IIClark125388,585
Sunshine Valley SolarNye104264,140
Battle Mountain Solar ProjectHumboldt101274,057