Solar power plant, Nevada

Copper Mountain Solar 2 power plant, Nevada

Copper Mountain Solar 2 is a 154 MW solar power plant in Clark County, Nevada, operated by RWE Clean Energy, and it generated 726,034 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.6% of the generation reported in Nevada, and its capacity factor sits at the 100th percentile of U.S. solar plants. By 2025 generation it ranks 959th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

154 MWNameplate capacity
54%Capacity factor, 2025, 100th percentile, on 154 MW net summer
1.6%Of NV generation, 2025
12 yearsAverage generator age, by MW

How hard does the Copper Mountain Solar 2 plant run compared with other solar plants?

The Copper Mountain Solar 2 plant had a capacity factor of 54% in 2025 on 154 MW of net summer capacity, the 100th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 196 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Copper Mountain Solar 254%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Copper Mountain Solar 2 plant generating more or less than last year?

Generation at Copper Mountain Solar 2 rose 103.9% from 2024 to 2025, from 356,125 MWh to 726,034 MWh.

Net generation by period
PeriodMWh
2024356,125
2025726,034
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202543,693
November 202540,780
October 202564,957
September 202562,273
August 202567,568
July 202570,895
June 202569,364
May 202571,517
April 202565,277
March 202562,357
February 202554,567
January 202552,786
December 202422,593
November 202426,173
October 202430,287
September 202432,904
August 202433,260
July 202434,286
June 202434,442
May 202435,708
April 202433,891
March 202429,144
February 202422,378
January 202421,059

Source: EIA Form EIA-923, through August 2026.

How much of Nevada's electricity comes from the Copper Mountain Solar 2 plant?

Copper Mountain Solar 2 made 1.6% of the 45,180,066 MWh reported by Nevada plants in 2025, from 0.8% of the state's 18,959 MW of capacity. Its share of output is 2.0 times its share of capacity. By capacity it is the 32nd largest of 117 plants in Nevada, the 1,935th largest of 14,327 in the U.S. and the 249th largest of 7,223 solar plants. By 2025 generation it is the 13th largest of 112 generating plants in the state.

Copper Mountain Solar 2 within Nevada, 2025
MeasureThis plantNevadaShare
Capacity (MW)15418,9590.8%
Generation (MWh)726,03445,180,0661.6%
Solar capacity (MW)1545,1953.0%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Copper Mountain Solar 2 plant, and when do they retire?

5 operable generators total 154 MW, with an average age of 12 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s5154100%none reported
Every generator, 5 in all
UnitStatusTechnologyMWIn servicePlanned retirement
PV01OperatingSolar Photovoltaic302012n/a
PV02OperatingSolar Photovoltaic302012n/a
PV03OperatingSolar Photovoltaic342012n/a
PV04OperatingSolar Photovoltaic302015n/a
PV05OperatingSolar Photovoltaic302015n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Copper Mountain Solar 2 plant?

EIA lists no joint owners for Copper Mountain Solar 2. RWE Clean Energy operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Copper Mountain Solar 2 plant?

Copper Mountain Solar 2 is in Boulder City, Clark County, Nevada, at 35.7864° N, 114.9628° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Nevada are similar in size?

Nevada has 58 operable solar plants with 5,195 MW of capacity, and Copper Mountain Solar 2's 154 MW is 3% of that.

Solar plants in Nevada around this size
PlantCountyMW2025 MWh
Dodge FlatWashoe200551,198
Escape Solar PlantLincoln185124,862
Townsite Solar Project HybridClark180480,691
Copper Mountain Solar 2Clark154726,034
Dry Lake Solar Energy CenterClark150378,908
Crescent Dunes Solar EnergyNye12558,997
Yellow Pine SolarClark125387,833

Source: EIA Forms EIA-860 and EIA-923, 2025.