Escape Solar Plant, Nevada

Escape Solar Plant is a 285 MW power plant, 185 MW of it solar, in Lincoln County, Nevada, operated by Escape Solar LLC, and it generated 123,654 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in Nevada, and its capacity factor sits at the 6th percentile of U.S. solar plants. By 2025 generation it ranks 3,163rd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

285 MWNameplate capacity
8%Capacity factor, 2025, solar units, 6th percentile, on 185 MW net summer
0.3%Of NV generation, 2025
Under 1 yearAverage generator age, by MW

How hard does Escape Solar Plant run compared with other solar plants?

Escape Solar Plant's solar units had a capacity factor of 8% in 2025 on 185 MW of net summer capacity, the 6th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 28 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Escape Solar Plant8%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is Escape Solar Plant generating more or less than last year?

Escape Solar Plant generated 123,654 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 729.7% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024n/a
2025123,654
2026 through August363,506
2025, same months43,812
Monthly generation, Jun 2025 to Aug 2026
MonthMWh
August 202648,605
July 202655,456
June 202659,634
May 202659,127
April 202647,139
March 202645,435
February 202629,775
January 202618,335
December 202522,198
November 202525,233
October 202515,004
September 202517,407
August 202520,483
July 202523,329
June 20250

Source: EIA Form EIA-923, through August 2026.

How much of Nevada's electricity comes from Escape Solar Plant?

Escape Solar Plant made 0.3% of the 45,180,066 MWh reported by Nevada plants in 2025, from 1.5% of the state's 18,959 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 15th largest of 117 plants in Nevada, the 1,131st largest of 14,327 in the U.S. and the 208th largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 50th largest of 112 generating plants in the state.

Escape Solar Plant within Nevada, 2025
MeasureThis plantNevadaShare
Capacity (MW)28518,9591.5%
Generation (MWh)123,65445,180,0660.3%
Solar capacity (MW)1855,1953.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at Escape Solar Plant, and when do they retire?

3 operable generators total 285 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s3285100%none reported
Every generator, 3 in all
UnitStatusTechnologyMWIn servicePlanned retirement
ESPH1OperatingSolar Photovoltaic702025n/a
ESPH2OperatingSolar Photovoltaic1152025n/a
ESPHBOperatingBatteries1002025n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns Escape Solar Plant?

Estuary Power LLC is the only joint owner reported for Escape Solar Plant, with 100.0%. Escape Solar LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does Escape Solar Plant use?

Escape Solar Plant has capacity on 2 fuels: 65% solar and 35% battery and pumped storage. In 2025, solar made 101% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar18564.9%124,862
Battery and pumped storage10035.1%-1,208

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is Escape Solar Plant?

Escape Solar Plant is in TBD, Lincoln County, Nevada, at 36.8944° N, 114.0885° W. It sits in the Nevada Power Company balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Nevada are similar in size?

Nevada has 58 operable solar plants with 5,195 MW of capacity, and Escape Solar Plant's 185 MW is 4% of that.

Solar plants in Nevada around this size
PlantCountyMW2025 MWh
Techren Solar II LLCClark200491,862
Arrow Canyon Solar HybridClark200610,067
Dodge FlatWashoe200551,198
Escape Solar PlantLincoln185124,862
Townsite Solar Project HybridClark180480,691
Copper Mountain Solar 2Clark154726,034
Dry Lake Solar Energy CenterClark150378,908

Source: EIA Forms EIA-860 and EIA-923, 2025.