Techren Solar II LLC power plant, Nevada

Techren Solar II LLC is a 200 MW solar power plant in Clark County, Nevada, operated by Techren Solar II LLC, and it generated 491,862 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.1% of the generation reported in Nevada, and its capacity factor sits at the 83rd percentile of U.S. solar plants. By 2025 generation it ranks 1,356th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

200 MWNameplate capacity
28%Capacity factor, 2025, 83rd percentile, on 200 MW net summer
1.1%Of NV generation, 2025
6 yearsAverage generator age, by MW

How hard does the Techren Solar II LLC plant run compared with other solar plants?

The Techren Solar II LLC plant had a capacity factor of 28% in 2025 on 200 MW of net summer capacity, the 83rd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 102 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Techren Solar II LLC28%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Techren Solar II LLC plant generating more or less than last year?

Generation at Techren Solar II LLC fell 2.3% from 2024 to 2025, from 503,228 MWh to 491,862 MWh. Through August 2026 it is running 12.1% behind the same months of 2025.

Net generation by period
PeriodMWh
2024503,228
2025491,862
2026 through August309,680
2025, same months352,338
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202649,992
July 202657,434
June 202662,037
May 202664,028
April 202617,112
March 20260
February 202631,058
January 202628,019
December 202525,900
November 202526,584
October 202542,649
September 202544,391
August 202551,483
July 202559,048
June 202560,556
May 202545,095
April 202546,877
March 202538,657
February 202529,836
January 202520,786
December 202426,618
November 202431,444
October 202439,091
September 202432,447
August 202433,901
July 202457,051
June 202460,961
May 202465,739
April 202457,844
March 202443,163
February 202429,376
January 202425,593

Source: EIA Form EIA-923, through August 2026.

How much of Nevada's electricity comes from the Techren Solar II LLC plant?

Techren Solar II LLC made 1.1% of the 45,180,066 MWh reported by Nevada plants in 2025, from 1.1% of the state's 18,959 MW of capacity. By capacity it is the 29th largest of 117 plants in Nevada, the 1,524th largest of 14,327 in the U.S. and the 141st largest of 7,223 solar plants. By 2025 generation it is the 22nd largest of 112 generating plants in the state.

Techren Solar II LLC within Nevada, 2025
MeasureThis plantNevadaShare
Capacity (MW)20018,9591.1%
Generation (MWh)491,86245,180,0661.1%
Solar capacity (MW)2005,1953.8%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Techren Solar II LLC plant, and when do they retire?

1 operable generator totals 200 MW, with an average age of 6 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s1200100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
TECH2OperatingSolar Photovoltaic2002019n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Techren Solar II LLC plant?

Kkr/Ga is the only joint owner reported for Techren Solar II LLC, with 100.0%. Techren Solar II LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Techren Solar II LLC plant?

Techren Solar II LLC is in Boulder, Clark County, Nevada, at 35.8673° N, 114.9564° W. It sits in the Nevada Power Company balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Nevada are similar in size?

Nevada has 58 operable solar plants with 5,195 MW of capacity, and Techren Solar II LLC's 200 MW is 4% of that.

Solar plants in Nevada around this size
PlantCountyMW2025 MWh
Copper Mountain Solar 3Clark255597,368
Copper Mountain Solar 5, LLCClark252691,408
Moapa Southern PaiuteClark250611,738
Techren Solar II LLCClark200491,862
Arrow Canyon Solar HybridClark200610,067
Dodge FlatWashoe200551,198
Escape Solar PlantLincoln185124,862