Solar power plant, Nevada

Copper Mountain Solar 3 power plant, Nevada

Copper Mountain Solar 3 is a 255 MW solar power plant in Clark County, Nevada, operated by RWE Clean Energy, and it generated 597,368 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.3% of the generation reported in Nevada, and its capacity factor sits at the 76th percentile of U.S. solar plants. By 2025 generation it ranks 1,130th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

255 MWNameplate capacity
27%Capacity factor, 2025, 76th percentile, on 255 MW net summer
1.3%Of NV generation, 2025
11 yearsAverage generator age, by MW

How hard does the Copper Mountain Solar 3 plant run compared with other solar plants?

The Copper Mountain Solar 3 plant had a capacity factor of 27% in 2025 on 255 MW of net summer capacity, the 76th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 98 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Copper Mountain Solar 327%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Copper Mountain Solar 3 plant generating more or less than last year?

Generation at Copper Mountain Solar 3 fell 2.2% from 2024 to 2025, from 610,984 MWh to 597,368 MWh. Through August 2026 it is running 0.2% behind the same months of 2025.

Net generation by period
PeriodMWh
2024610,984
2025597,368
2026 through August430,114
2025, same months431,097
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202652,423
July 202658,238
June 202660,223
May 202665,453
April 202659,110
March 202656,668
February 202641,304
January 202636,695
December 202531,686
November 202534,836
October 202549,210
September 202550,539
August 202556,478
July 202560,737
June 202560,475
May 202561,908
April 202558,660
March 202547,791
February 202544,146
January 202540,902
December 202434,649
November 202440,833
October 202450,330
September 202454,647
August 202458,194
July 202460,149
June 202462,345
May 202466,667
April 202460,675
March 202450,479
February 202437,328
January 202434,688

Source: EIA Form EIA-923, through August 2026.

How much of Nevada's electricity comes from the Copper Mountain Solar 3 plant?

Copper Mountain Solar 3 made 1.3% of the 45,180,066 MWh reported by Nevada plants in 2025, from 1.3% of the state's 18,959 MW of capacity. By capacity it is the 20th largest of 117 plants in Nevada, the 1,215th largest of 14,327 in the U.S. and the 73rd largest of 7,223 solar plants. By 2025 generation it is the 18th largest of 112 generating plants in the state.

Copper Mountain Solar 3 within Nevada, 2025
MeasureThis plantNevadaShare
Capacity (MW)25518,9591.3%
Generation (MWh)597,36845,180,0661.3%
Solar capacity (MW)2555,1954.9%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Copper Mountain Solar 3 plant, and when do they retire?

10 operable generators total 255 MW, with an average age of 11 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s10255100%none reported
Every generator, 10 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingSolar Photovoltaic262014n/a
2OperatingSolar Photovoltaic272014n/a
3OperatingSolar Photovoltaic262014n/a
4OperatingSolar Photovoltaic282014n/a
5OperatingSolar Photovoltaic252014n/a
6OperatingSolar Photovoltaic262014n/a
7OperatingSolar Photovoltaic262014n/a
8OperatingSolar Photovoltaic262014n/a
9OperatingSolar Photovoltaic242015n/a
10OperatingSolar Photovoltaic212015n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Copper Mountain Solar 3 plant?

EIA lists no joint owners for Copper Mountain Solar 3. RWE Clean Energy operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Copper Mountain Solar 3 plant?

Copper Mountain Solar 3 is in Boulder City, Clark County, Nevada, at 35.8894° N, 114.9579° W. It sits in the Los Angeles Department of Water and Power balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Nevada are similar in size?

Nevada has 58 operable solar plants with 5,195 MW of capacity, and Copper Mountain Solar 3's 255 MW is 5% of that.

Solar plants in Nevada around this size
PlantCountyMW2025 MWh
Eagle Shadow Mountain Solar FarmClark300901,380
Silver State Solar Power SouthClark260684,062
Copper Mountain Solar 3Clark255597,368
Copper Mountain Solar 5, LLCClark252691,408
Moapa Southern PaiuteClark250611,738
Techren Solar II LLCClark200491,862

Source: EIA Forms EIA-860 and EIA-923, 2025.