Skip to main content
RateWatt

Solar power plant, Nevada

Moapa Southern Paiute solar power plant, Nevada

Moapa Southern Paiute is a 250 MW solar power plant in Clark County, Nevada, operated by Arevon Energy, Inc., and it generated 611,738 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.4% of the generation reported in Nevada, and its capacity factor sits at the 82nd percentile of U.S. solar plants. By 2025 generation it ranks 1,109th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

250 MWNameplate capacity
28%Capacity factor, 2025, 82nd percentile, on 250 MW net summer
1.4%Of NV generation, 2025
9 yearsAverage generator age, by MW

How hard does the Moapa Southern Paiute plant run compared with other solar plants?

The Moapa Southern Paiute plant had a capacity factor of 28% in 2025 on 250 MW of net summer capacity, the 82nd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 102 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Moapa Southern Paiute28%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Moapa Southern Paiute plant generating more or less than last year?

Generation at Moapa Southern Paiute fell 0.5% from 2024 to 2025, from 614,690 MWh to 611,738 MWh. Through August 2026 it is running 1.1% behind the same months of 2025.

Net generation by period
PeriodMWh
2024614,690
2025611,738
2026 through August428,311
2025, same months433,231
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202656,375
July 202660,641
June 202657,830
May 202655,300
April 202660,468
March 202657,827
February 202642,721
January 202637,149
December 202534,269
November 202536,740
October 202553,205
September 202554,293
August 202559,107
July 202564,040
June 202563,551
May 202558,268
April 202559,154
March 202544,958
February 202543,351
January 202540,802
December 202435,322
November 202440,181
October 202450,090
September 202456,634
August 202461,384
July 202462,961
June 202460,724
May 202466,162
April 202460,554
March 202451,125
February 202435,984
January 202433,569

Source: EIA Form EIA-923, through August 2026.

How much of Nevada's electricity comes from the Moapa Southern Paiute plant?

Moapa Southern Paiute made 1.4% of the 45,180,066 MWh reported by Nevada plants in 2025, from 1.3% of the state's 18,959 MW of capacity. By capacity it is the 22nd largest of 117 plants in Nevada, the 1,239th largest of 14,327 in the U.S. and the 81st largest of 7,223 solar plants. By 2025 generation it is the 17th largest of 112 generating plants in the state.

Moapa Southern Paiute within Nevada, 2025
MeasureThis plantNevadaShare
Capacity (MW)25018,9591.3%
Generation (MWh)611,73845,180,0661.4%
Solar capacity (MW)2505,1954.8%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Moapa Southern Paiute plant, and when do they retire?

1 operable generator totals 250 MW, with an average age of 9 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s1250100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingSolar Photovoltaic2502016n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Moapa Southern Paiute plant?

2 owners report shares in Moapa Southern Paiute; Moapa Southern Paiute LLC holds the largest named share, 65.0% or about 163 MW. Arevon Energy, Inc. operates the plant.

Reported ownership of operable capacity
OwnerShareMW2025 MWh, by share
Moapa Southern Paiute LLC65.0%163397,630
Goldman Sachs/General Electric35.0%88214,108

Source: EIA Form EIA-860, Owner, 2025 final. MW and MWh by share multiply the plant totals by each owner's percentage.

Where is the Moapa Southern Paiute plant?

Moapa Southern Paiute is in Moapa, Clark County, Nevada, at 36.5299° N, 114.7703° W. It sits in the Nevada Power Company balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Nevada are similar in size?

Nevada has 58 operable solar plants with 5,195 MW of capacity, and Moapa Southern Paiute's 250 MW is 5% of that.

Solar plants in Nevada around this size
PlantCountyMW2025 MWh
Silver State Solar Power SouthClark260684,062
Copper Mountain Solar 3Clark255597,368
Copper Mountain Solar 5, LLCClark252691,408
Moapa Southern PaiuteClark250611,738
Techren Solar II LLCClark200491,862
Arrow Canyon Solar HybridClark200610,067
Dodge FlatWashoe200551,198

Source: EIA Forms EIA-860 and EIA-923, 2025.