Skip to main content
RateWatt

Solar power plant, Nevada

Dodge Flat solar power plant, Nevada

Dodge Flat is a 250 MW power plant, 200 MW of it solar, in Washoe County, Nevada, operated by Dodge Flat Solar, LLC, and it generated 546,041 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.2% of the generation reported in Nevada, and its capacity factor sits at the 95th percentile of U.S. solar plants. By 2025 generation it ranks 1,253rd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

250 MWNameplate capacity
31%Capacity factor, 2025, solar units, 95th percentile, on 200 MW net summer
1.2%Of NV generation, 2025
3 yearsAverage generator age, by MW

How hard does the Dodge Flat plant run compared with other solar plants?

The Dodge Flat plant's solar units had a capacity factor of 31% in 2025 on 200 MW of net summer capacity, the 95th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 115 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Dodge Flat31%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the Dodge Flat plant generating more or less than last year?

Generation at Dodge Flat rose 0.4% from 2024 to 2025, from 543,908 MWh to 546,041 MWh. Through August 2026 it is running 4.0% behind the same months of 2025.

Net generation by period
PeriodMWh
2024543,908
2025546,041
2026 through August395,150
2025, same months411,557
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202655,503
July 202663,594
June 202666,001
May 202655,583
April 202649,121
March 202648,660
February 202628,255
January 202628,433
December 202522,782
November 202524,263
October 202539,613
September 202547,826
August 202558,774
July 202565,397
June 202566,924
May 202561,694
April 202553,931
March 202542,215
February 202533,507
January 202529,115
December 202420,936
November 202426,086
October 202440,894
September 202451,825
August 202461,526
July 202464,093
June 202465,711
May 202465,923
April 202453,417
March 202443,749
February 202428,954
January 202420,794

Source: EIA Form EIA-923, through August 2026.

How much of Nevada's electricity comes from the Dodge Flat plant?

Dodge Flat made 1.2% of the 45,180,066 MWh reported by Nevada plants in 2025, from 1.3% of the state's 18,959 MW of capacity. By capacity it is the 22nd largest of 117 plants in Nevada, the 1,239th largest of 14,327 in the U.S. and the 148th largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 21st largest of 112 generating plants in the state.

Dodge Flat within Nevada, 2025
MeasureThis plantNevadaShare
Capacity (MW)25018,9591.3%
Generation (MWh)546,04145,180,0661.2%
Solar capacity (MW)2005,1953.8%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Dodge Flat plant, and when do they retire?

2 operable generators total 250 MW, with an average age of 3 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s2250100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
DODGBOperatingBatteries502022n/a
DODGEOperatingSolar Photovoltaic2002022n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Dodge Flat plant?

EIA lists no joint owners for Dodge Flat. Dodge Flat Solar, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Dodge Flat plant use?

Dodge Flat has capacity on 2 fuels: 80% solar and 20% battery and pumped storage. In 2025, solar made 101% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar20080.0%551,198
Battery and pumped storage5020.0%-5,157

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Dodge Flat plant?

Dodge Flat is in Reno, Washoe County, Nevada, at 40.7130° N, 119.4672° W. It sits in the Nevada Power Company balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Nevada are similar in size?

Nevada has 58 operable solar plants with 5,195 MW of capacity, and Dodge Flat's 200 MW is 4% of that.

Solar plants in Nevada around this size
PlantCountyMW2025 MWh
Moapa Southern PaiuteClark250611,738
Techren Solar II LLCClark200491,862
Arrow Canyon Solar HybridClark200610,067
Dodge FlatWashoe200551,198
Escape Solar PlantLincoln185124,862
Townsite Solar Project HybridClark180480,691
Copper Mountain Solar 2Clark154726,034

Source: EIA Forms EIA-860 and EIA-923, 2025.