Townsite Solar Project Hybrid is a 270 MW power plant, 180 MW of it solar, in Clark County, Nevada, operated by Townsite Solar, LLC, and it generated 465,922 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.0% of the generation reported in Nevada, and its capacity factor sits at the 99th percentile of U.S. solar plants. By 2025 generation it ranks 1,416th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

270 MWNameplate capacity
34%Capacity factor, 2025, solar units, 99th percentile, on 160 MW net summer
1.0%Of NV generation, 2025
4 yearsAverage generator age, by MW

How hard does the Townsite Solar Project Hybrid plant run compared with other solar plants?

The Townsite Solar Project Hybrid plant's solar units had a capacity factor of 34% in 2025 on 160 MW of net summer capacity, the 99th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 125 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Townsite Solar Project Hybrid34%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the Townsite Solar Project Hybrid plant generating more or less than last year?

Generation at Townsite Solar Project Hybrid rose 5.9% from 2024 to 2025, from 440,001 MWh to 465,922 MWh. Through August 2026 it is running 2.2% behind the same months of 2025.

Net generation by period
PeriodMWh
2024440,001
2025465,922
2026 through August347,476
2025, same months355,172
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202643,169
July 202649,606
June 202658,476
May 202655,293
April 202649,667
March 202642,786
February 202625,509
January 202622,970
December 202519,397
November 202523,294
October 202531,054
September 202537,005
August 202548,264
July 202554,854
June 202555,084
May 202552,941
April 202548,087
March 202537,251
February 202532,209
January 202526,482
December 202411,103
November 202423,012
October 202433,346
September 202441,530
August 202448,235
July 202447,242
June 202455,700
May 202457,405
April 202448,345
March 202435,758
February 202422,425
January 202415,900

Source: EIA Form EIA-923, through August 2026.

How much of Nevada's electricity comes from the Townsite Solar Project Hybrid plant?

Townsite Solar Project Hybrid made 1.0% of the 45,180,066 MWh reported by Nevada plants in 2025, from 1.4% of the state's 18,959 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 18th largest of 117 plants in Nevada, the 1,177th largest of 14,327 in the U.S. and the 212th largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 24th largest of 112 generating plants in the state.

Townsite Solar Project Hybrid within Nevada, 2025
MeasureThis plantNevadaShare
Capacity (MW)27018,9591.4%
Generation (MWh)465,92245,180,0661.0%
Solar capacity (MW)1805,1953.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Townsite Solar Project Hybrid plant, and when do they retire?

2 operable generators total 270 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s2270100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GEN01OperatingSolar Photovoltaic1802021n/a
GEN02OperatingBatteries902021n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Townsite Solar Project Hybrid plant?

EIA lists no joint owners for Townsite Solar Project Hybrid. Townsite Solar, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Townsite Solar Project Hybrid plant use?

Townsite Solar Project Hybrid has capacity on 2 fuels: 67% solar and 33% battery and pumped storage. In 2025, solar made 103% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar18066.7%480,691
Battery and pumped storage9033.3%-14,769

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Townsite Solar Project Hybrid plant?

Townsite Solar Project Hybrid is in Boulder City, Clark County, Nevada, at 35.9373° N, 114.8840° W. It sits in the Western Area Power Administration - Desert Southwest Region balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Nevada are similar in size?

Nevada has 58 operable solar plants with 5,195 MW of capacity, and Townsite Solar Project Hybrid's 180 MW is 3% of that.

Solar plants in Nevada around this size
PlantCountyMW2025 MWh
Arrow Canyon Solar HybridClark200610,067
Dodge FlatWashoe200551,198
Escape Solar PlantLincoln185124,862
Townsite Solar Project HybridClark180480,691
Copper Mountain Solar 2Clark154726,034
Dry Lake Solar Energy CenterClark150378,908
Crescent Dunes Solar EnergyNye12558,997