Skip to main content
RateWatt

Solar power plant, Nevada

Arrow Canyon Solar Hybrid power plant, Nevada

Arrow Canyon Solar Hybrid is a 275 MW power plant, 200 MW of it solar, in Clark County, Nevada, operated by Arrow Canyon Solar LLC, and it generated 595,106 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.3% of the generation reported in Nevada, and its capacity factor sits at the 99th percentile of U.S. solar plants. By 2025 generation it ranks 1,133rd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

275 MWNameplate capacity
35%Capacity factor, 2025, solar units, 99th percentile, on 200 MW net summer
1.3%Of NV generation, 2025
2 yearsAverage generator age, by MW

How hard does the Arrow Canyon Solar Hybrid plant run compared with other solar plants?

The Arrow Canyon Solar Hybrid plant's solar units had a capacity factor of 35% in 2025 on 200 MW of net summer capacity, the 99th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 127 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Arrow Canyon Solar Hybrid35%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the Arrow Canyon Solar Hybrid plant generating more or less than last year?

Generation at Arrow Canyon Solar Hybrid fell 0.8% from 2024 to 2025, from 599,632 MWh to 595,106 MWh. Through August 2026 it is running 1.2% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024599,632
2025595,106
2026 through August441,785
2025, same months436,629
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202657,152
July 202663,167
June 202667,677
May 202668,822
April 202660,327
March 202655,281
February 202637,222
January 202632,137
December 202528,585
November 202530,250
October 202548,447
September 202551,195
August 202558,869
July 202565,333
June 202565,233
May 202563,907
April 202556,989
March 202549,058
February 202541,129
January 202536,111
December 202430,468
November 202435,896
October 202446,393
September 202456,365
August 202462,087
July 202462,256
June 202467,621
May 202468,347
April 202458,248
March 202448,057
February 202434,814
January 202429,080

Source: EIA Form EIA-923, through August 2026.

How much of Nevada's electricity comes from the Arrow Canyon Solar Hybrid plant?

Arrow Canyon Solar Hybrid made 1.3% of the 45,180,066 MWh reported by Nevada plants in 2025, from 1.5% of the state's 18,959 MW of capacity. By capacity it is the 17th largest of 117 plants in Nevada, the 1,161st largest of 14,327 in the U.S. and the 145th largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 19th largest of 112 generating plants in the state.

Arrow Canyon Solar Hybrid within Nevada, 2025
MeasureThis plantNevadaShare
Capacity (MW)27518,9591.5%
Generation (MWh)595,10645,180,0661.3%
Solar capacity (MW)2005,1953.8%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Arrow Canyon Solar Hybrid plant, and when do they retire?

2 operable generators total 275 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s2275100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingSolar Photovoltaic2002023n/a
2OperatingBatteries752023n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Arrow Canyon Solar Hybrid plant?

EIA lists no joint owners for Arrow Canyon Solar Hybrid. Arrow Canyon Solar LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Arrow Canyon Solar Hybrid plant use?

Arrow Canyon Solar Hybrid has capacity on 2 fuels: 73% solar and 27% battery and pumped storage. In 2025, solar made 103% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar20072.7%610,067
Battery and pumped storage7527.3%-14,961

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Arrow Canyon Solar Hybrid plant?

Arrow Canyon Solar Hybrid is in Moapa, Clark County, Nevada, at 36.4593° N, 114.8444° W. It sits in the Nevada Power Company balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Nevada are similar in size?

Nevada has 58 operable solar plants with 5,195 MW of capacity, and Arrow Canyon Solar Hybrid's 200 MW is 4% of that.

Solar plants in Nevada around this size
PlantCountyMW2025 MWh
Copper Mountain Solar 5, LLCClark252691,408
Moapa Southern PaiuteClark250611,738
Techren Solar II LLCClark200491,862
Arrow Canyon Solar HybridClark200610,067
Dodge FlatWashoe200551,198
Escape Solar PlantLincoln185124,862
Townsite Solar Project HybridClark180480,691