Skip to main content
RateWatt

Solar power plant, Nevada

Copper Mountain Solar 5, LLC power plant, Nevada

Copper Mountain Solar 5, LLC is a 252 MW solar power plant in Clark County, Nevada, operated by RWE Clean Energy, and it generated 691,408 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.5% of the generation reported in Nevada, and its capacity factor sits at the 96th percentile of U.S. solar plants. By 2025 generation it ranks 1,004th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

252 MWNameplate capacity
32%Capacity factor, 2025, 96th percentile, on 250 MW net summer
1.5%Of NV generation, 2025
4 yearsAverage generator age, by MW

How hard does the Copper Mountain Solar 5, LLC plant run compared with other solar plants?

The Copper Mountain Solar 5, LLC plant had a capacity factor of 32% in 2025 on 250 MW of net summer capacity, the 96th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 115 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Copper Mountain Solar 5, LLC32%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Copper Mountain Solar 5, LLC plant generating more or less than last year?

Generation at Copper Mountain Solar 5, LLC rose 2.5% from 2024 to 2025, from 674,429 MWh to 691,408 MWh. Through August 2026 it is running 0.6% behind the same months of 2025.

Net generation by period
PeriodMWh
2024674,429
2025691,408
2026 through August505,465
2025, same months508,405
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202663,785
July 202672,240
June 202679,867
May 202681,861
April 202668,745
March 202663,105
February 202641,217
January 202634,645
December 202539,147
November 202532,958
October 202553,774
September 202557,124
August 202568,789
July 202577,187
June 202576,899
May 202575,548
April 202569,046
March 202558,126
February 202544,359
January 202538,451
December 202431,924
November 202439,108
October 202451,583
September 202461,027
August 202467,902
July 202471,835
June 202479,111
May 202481,044
April 202471,212
March 202453,719
February 202436,023
January 202429,941

Source: EIA Form EIA-923, through August 2026.

How much of Nevada's electricity comes from the Copper Mountain Solar 5, LLC plant?

Copper Mountain Solar 5, LLC made 1.5% of the 45,180,066 MWh reported by Nevada plants in 2025, from 1.3% of the state's 18,959 MW of capacity. By capacity it is the 21st largest of 117 plants in Nevada, the 1,228th largest of 14,327 in the U.S. and the 78th largest of 7,223 solar plants. By 2025 generation it is the 14th largest of 112 generating plants in the state.

Copper Mountain Solar 5, LLC within Nevada, 2025
MeasureThis plantNevadaShare
Capacity (MW)25218,9591.3%
Generation (MWh)691,40845,180,0661.5%
Solar capacity (MW)2525,1954.9%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Copper Mountain Solar 5, LLC plant, and when do they retire?

1 operable generator totals 252 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1252100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
CM5-1OperatingSolar Photovoltaic2522021n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Copper Mountain Solar 5, LLC plant?

EIA lists no joint owners for Copper Mountain Solar 5, LLC. RWE Clean Energy operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Copper Mountain Solar 5, LLC plant?

Copper Mountain Solar 5, LLC is in Boulder City, Clark County, Nevada, at 35.7763° N, 114.9737° W. It sits in the Nevada Power Company balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Nevada are similar in size?

Nevada has 58 operable solar plants with 5,195 MW of capacity, and Copper Mountain Solar 5, LLC's 252 MW is 5% of that.

Solar plants in Nevada around this size
PlantCountyMW2025 MWh
Eagle Shadow Mountain Solar FarmClark300901,380
Silver State Solar Power SouthClark260684,062
Copper Mountain Solar 3Clark255597,368
Copper Mountain Solar 5, LLCClark252691,408
Moapa Southern PaiuteClark250611,738
Techren Solar II LLCClark200491,862
Arrow Canyon Solar HybridClark200610,067

Source: EIA Forms EIA-860 and EIA-923, 2025.