Skip to main content
RateWatt

Solar power plant, Nevada

Yellow Pine II solar power plant, Nevada

Yellow Pine II is a 210 MW power plant, 125 MW of it solar, in Clark County, Nevada, operated by Yellow Pine Solar II, LLC, and it generated 373,638 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.8% of the generation reported in Nevada, and its capacity factor sits at the 99th percentile of U.S. solar plants. By 2025 generation it ranks 1,685th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

210 MWNameplate capacity
35%Capacity factor, 2025, solar units, 99th percentile, on 125 MW net summer
0.8%Of NV generation, 2025
1 yearAverage generator age, by MW

How hard does the Yellow Pine II plant run compared with other solar plants?

The Yellow Pine II plant's solar units had a capacity factor of 35% in 2025 on 125 MW of net summer capacity, the 99th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 130 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Yellow Pine II35%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the Yellow Pine II plant generating more or less than last year?

Yellow Pine II generated 373,638 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 0.2% behind the same months of 2025. 2024 has output for only 8 months, so the two years are not compared.

Net generation by period
PeriodMWh
2024233,626
2025373,638
2026 through August273,623
2025, same months274,054
Monthly generation, May 2024 to Aug 2026
MonthMWh
August 202637,605
July 202637,513
June 202640,955
May 202643,081
April 202636,704
March 202634,748
February 202622,700
January 202620,317
December 202517,681
November 202518,852
October 202530,727
September 202532,324
August 202537,924
July 202542,016
June 202540,416
May 202539,406
April 202535,788
March 202529,641
February 202525,138
January 202523,725
December 202419,637
November 20245,696
October 202447,232
September 202451,308
August 202414,615
July 202459,735
June 202430,791
May 20244,612

Source: EIA Form EIA-923, through August 2026.

How much of Nevada's electricity comes from the Yellow Pine II plant?

Yellow Pine II made 0.8% of the 45,180,066 MWh reported by Nevada plants in 2025, from 1.1% of the state's 18,959 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 28th largest of 117 plants in Nevada, the 1,435th largest of 14,327 in the U.S. and the 371st largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 30th largest of 112 generating plants in the state.

Yellow Pine II within Nevada, 2025
MeasureThis plantNevadaShare
Capacity (MW)21018,9591.1%
Generation (MWh)373,63845,180,0660.8%
Solar capacity (MW)1255,1952.4%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Yellow Pine II plant, and when do they retire?

4 operable generators total 210 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s4210100%none reported
Every generator, 4 in all
UnitStatusTechnologyMWIn servicePlanned retirement
YP2ABOperatingBatteries532024n/a
YP2APOperatingSolar Photovoltaic602024n/a
YP2BBOperatingBatteries322024n/a
YP2BPOperatingSolar Photovoltaic652024n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Yellow Pine II plant?

EIA lists no joint owners for Yellow Pine II. Yellow Pine Solar II, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Yellow Pine II plant use?

Yellow Pine II has capacity on 2 fuels: 60% solar and 40% battery and pumped storage. In 2025, solar made 104% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar12559.5%388,585
Battery and pumped storage8540.5%-14,947

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Yellow Pine II plant?

Yellow Pine II is in Enterprise, Clark County, Nevada, at 36.0755° N, 115.7913° W. It sits in the Nevada Power Company balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Nevada are similar in size?

Nevada has 58 operable solar plants with 5,195 MW of capacity, and Yellow Pine II's 125 MW is 2% of that.

Solar plants in Nevada around this size
PlantCountyMW2025 MWh
Dry Lake Solar Energy CenterClark150378,908
Crescent Dunes Solar EnergyNye12558,997
Yellow Pine SolarClark125387,833
Yellow Pine IIClark125388,585
Sunshine Valley SolarNye104264,140
Battle Mountain Solar ProjectHumboldt101274,057
Playa Solar 2Clark100255,099

Source: EIA Forms EIA-860 and EIA-923, 2025.