Wind power plant, Wyoming

Cedar Springs I wind power plant, Wyoming

Cedar Springs I is a 200 MW wind power plant in Converse County, Wyoming, operated by Cedar Springs Wind, LLC, and it generated 699,700 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.5% of the generation reported in Wyoming, and its capacity factor sits at the 73rd percentile of U.S. wind plants. By 2025 generation it ranks 992nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

200 MWNameplate capacity
40%Capacity factor, 2025, 73rd percentile, on 200 MW net summer
1.5%Of WY generation, 2025
5 yearsAverage generator age, by MW

How hard does the Cedar Springs I plant run compared with other wind plants?

The Cedar Springs I plant had a capacity factor of 40% in 2025 on 200 MW of net summer capacity, the 73rd percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 146 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Cedar Springs I40%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Cedar Springs I plant generating more or less than last year?

Generation at Cedar Springs I fell 6.6% from 2024 to 2025, from 749,149 MWh to 699,700 MWh. Through August 2026 it is running 10.3% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024749,149
2025699,700
2026 through August477,627
2025, same months433,121
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202643,012
July 202637,735
June 202655,329
May 202654,154
April 202658,109
March 202671,153
February 202665,917
January 202692,218
December 202596,152
November 202565,371
October 202560,837
September 202544,219
August 202540,572
July 202544,080
June 202540,179
May 202556,105
April 202553,927
March 202572,162
February 202549,294
January 202576,802
December 202482,518
November 202480,444
October 202452,417
September 202455,518
August 202445,246
July 202436,494
June 202464,438
May 202456,710
April 202461,939
March 202468,271
February 202471,333
January 202473,821

Source: EIA Form EIA-923, through August 2026.

How much of Wyoming's electricity comes from the Cedar Springs I plant?

Cedar Springs I made 1.5% of the 45,576,517 MWh reported by Wyoming plants in 2025, from 1.6% of the state's 12,736 MW of capacity. By capacity it is the 13th largest of 71 plants in Wyoming, the 1,524th largest of 14,327 in the U.S. and the 313th largest of 1,358 wind plants. By 2025 generation it is the 13th largest of 69 generating plants in the state.

Cedar Springs I within Wyoming, 2025
MeasureThis plantWyomingShare
Capacity (MW)20012,7361.6%
Generation (MWh)699,70045,576,5171.5%
Wind capacity (MW)2004,7074.2%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Cedar Springs I plant, and when do they retire?

1 operable generator totals 200 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1200100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
82633OperatingOnshore Wind Turbine2002020n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Cedar Springs I plant?

EIA lists no joint owners for Cedar Springs I. Cedar Springs Wind, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Cedar Springs I plant?

Cedar Springs I is in Douglas, Converse County, Wyoming, at 43.0197° N, 105.4721° W. It sits in the PacifiCorp - East balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Wyoming are similar in size?

Wyoming has 28 operable wind plants with 4,707 MW of capacity, and Cedar Springs I's 200 MW is 4% of that.

Wind plants in Wyoming around this size
PlantCountyMW2025 MWh
Ekola FlatsCarbon251736,070
Roundhouse Wind Energy ProjectLaramie226826,429
Top of the World Windpower ProjectConverse200495,841
Cedar Springs IConverse200699,700
Cedar Springs IIConverse200652,391
GlenrockConverse166469,225
Seven Mile HillCarbon146458,287

Source: EIA Forms EIA-860 and EIA-923, 2025.