WY power plants
Power plants in Wyoming
Wyoming has 71 operable power plants with 12.7 GW of nameplate capacity (Form EIA-860, 2025). The largest is Jim Bridger, at 2,326 MW, and coal has the most capacity, 37% of the state total.
What fuels do Wyoming's power plants use?
Coal makes up 37% of Wyoming's capacity, and wind 37%. The largest share of 2025 generation came from coal, at 49.1%.
| Fuel | Plants | Capacity | Share | 2025 MWh | Share |
|---|---|---|---|---|---|
| Coal | 11 | 4,735 MW | 37.2% | 22,365,988 | 49.1% |
| Wind | 28 | 4,707 MW | 37.0% | 12,725,057 | 27.9% |
| Natural gas | 10 | 2,730 MW | 21.4% | 9,054,041 | 19.9% |
| Hydro | 16 | 303 MW | 2.4% | 829,623 | 1.8% |
| Solar | 2 | 242 MW | 1.9% | 495,997 | 1.1% |
| Other-fuel | 2 | 13.5 MW | 0.1% | 105,512 | 0.2% |
| Petroleum | 2 | 4.7 MW | 0.0% | 299 | 0.0% |
Source: EIA Forms EIA-860 and EIA-923, 2025.
What power plants are in Wyoming?
The 10 largest of Wyoming's 71 plants hold 66% of its capacity, and half of the plants are 80 MW or smaller.
| Plant | Fuel | County | MW | 2025 MWh |
|---|---|---|---|---|
| Jim Bridger | Natural gas | Sweetwater | 2,326 | 7,596,779 |
| Laramie River Station | Coal | Platte | 1,863 | 9,071,841 |
| Dave Johnston | Coal | Converse | 817 | 4,273,471 |
| Naughton | Coal | Lincoln | 707 | 2,281,351 |
| Rock Creek Wind | Wind | Carbon | 590 | 212,181 |
| TB Flats | Wind | Carbon | 503 | 1,361,919 |
| Dry Fork Station | Coal | Campbell | 484 | 2,291,881 |
| Cedar Springs Wind IV | Wind | Converse | 390 | 1,055,641 |
| Wyodak | Coal | Campbell | 362 | 2,092,005 |
| Boswell Wind | Wind | Albany | 330 | 1,184,619 |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity is nameplate of operable generators. Ranks 1 to 10 run from 2,326 MW at Jim Bridger to 330 MW at Boswell Wind.
| Plant | Fuel | County | MW | 2025 MWh |
|---|---|---|---|---|
| Ekola Flats | Wind | Carbon | 251 | 736,070 |
| Roundhouse Wind Energy Project | Wind | Laramie | 226 | 826,429 |
| Top of the World Windpower Project | Wind | Converse | 200 | 495,841 |
| Cedar Springs I | Wind | Converse | 200 | 699,700 |
| Cedar Springs II | Wind | Converse | 200 | 652,391 |
| Glenrock | Wind | Converse | 166 | 469,225 |
| South Cheyenne Solar | Solar | Laramie | 150 | 322,715 |
| Seven Mile Hill | Wind | Carbon | 146 | 458,287 |
| TransAlta Wyoming Wind | Wind | Uinta | 144 | 321,444 |
| Shute Creek Facility | Natural gas | Lincoln | 144 | 870,882 |
| Cheyenne Prairie Generating Station | Natural gas | Laramie | 140 | 501,703 |
| Foote Creek Rim | Wind | Carbon | 135 | 636,186 |
| Cedar Springs III | Wind | Converse | 133 | 475,381 |
| Neil Simpson II | Coal | Campbell | 130 | 641,838 |
| Dunlap | Wind | Carbon | 130 | 416,651 |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity is nameplate of operable generators. Ranks 11 to 25 run from 251 MW at Ekola Flats to 130 MW at Dunlap.
| Plant | Fuel | County | MW | 2025 MWh |
|---|---|---|---|---|
| Anticline Wind | Wind | Natrona | 124 | 386,947 |
| High Plains | Wind | Albany | 122 | 341,222 |
| Wygen III | Coal | Campbell | 116 | 95,020 |
| Rolling Hills | Wind | Converse | 116 | 295,088 |
| Roundhouse Renewable Energy II | Wind | Laramie | 106 | 376,380 |
| Campbell Hill Windpower | Wind | Converse | 99 | 253,677 |
| Wygen 2 | Coal | Campbell | 95 | 595,589 |
| Sweetwater Solar | Solar | Sweetwater | 92 | 173,282 |
| Wygen 1 | Coal | Campbell | 90 | 538,741 |
| Mountain Wind Power II LLC | Wind | Uinta | 80 | 187,778 |
| Pioneer Wind Park, LLC | Wind | Converse | 80 | 252,550 |
| Fremont Canyon | Hydro | Natrona | 66.8 | 233,507 |
| Mountain Wind Power LLC | Wind | Uinta | 61 | 151,420 |
| Corriedale Wind Energy | Wind | Laramie | 52.5 | 214,312 |
| Seminoe | Hydro | Carbon | 51.6 | 84,528 |
| Silver Sage Windpower | Wind | Laramie | 42 | 100,242 |
| Alcova | Hydro | Natrona | 41.4 | 107,154 |
| WE Soda Alkalai LLC | Coal | Sweetwater | 41 | 268,907 |
| Neil Simpson Gas Turbine #2 | Natural gas | Campbell | 40 | 36,484 |
| Glendo | Hydro | Platte | 38 | 67,348 |
| Kortes | Hydro | Carbon | 36 | 105,700 |
| McFadden Ridge | Wind | Albany | 35.2 | 104,770 |
| General Chemical | Coal | Sweetwater | 30 | 215,344 |
| Happy Jack Windpower Project | Wind | Laramie | 29.4 | 58,706 |
| Hartzog | Natural gas | Campbell | 22.5 | 148 |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity is nameplate of operable generators. Ranks 26 to 50 run from 124 MW at Anticline Wind to 22.5 MW at Hartzog.
| Plant | Fuel | County | MW | 2025 MWh |
|---|---|---|---|---|
| Barber Creek | Natural gas | Campbell | 22.5 | 294 |
| Buffalo Bill | Hydro | Park | 18 | 57,457 |
| Casper Wind Farm | Wind | Natrona | 17 | 0 |
| Boysen | Hydro | Fremont | 15 | 42,481 |
| Arvada | Natural gas | Sheridan | 15 | 171 |
| Simplot Phosphates | Other-fuel | Sweetwater | 11.5 | 99,215 |
| Fontenelle | Hydro | Lincoln | 10 | 43,796 |
| Big Sand Draw Plant | Natural gas | Fremont | 8 | 38,184 |
| Beaver Creek Gas Plant | Natural gas | Fremont | 6.9 | 5,099 |
| Guernsey | Hydro | Platte | 6.4 | 14,570 |
| Heart Mountain | Hydro | Park | 5 | 16,174 |
| Sinclair Oil Refinery | Natural gas | Carbon | 5 | 4,297 |
| Spirit Mountain | Hydro | Park | 4.5 | 16,105 |
| Shoshone (WY) | Hydro | Park | 3 | 17,064 |
| Garland Canal Power Plant | Hydro | Park | 2.9 | 8,824 |
| Lake (WY) | Petroleum | Teton | 2.7 | 96 |
| Old Faithful | Petroleum | Teton | 2 | 203 |
| Elk Basin Gasoline Plant | Other-fuel | Park | 2 | 6,297 |
| Swift Creek | Hydro | Lincoln | 1.7 | 6,141 |
| Pilot Butte | Hydro | Fremont | 1.6 | n/a |
| Strawberry Creek | Hydro | Lincoln | 1.5 | 8,774 |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity is nameplate of operable generators. Ranks 51 to 71 run from 22.5 MW at Barber Creek to 1.5 MW at Strawberry Creek.
Which Wyoming plants are not running?
18 more sites in Wyoming have no operable generators in 2025: proposed projects, retired plants and sites still on file.
Show 18 sites without operable generators
| Site | County | Proposed | Retired |
|---|---|---|---|
| Chokecherry and Sierra Madre Wind | Carbon | 3,551 MW | n/a |
| Dutchman Solar generation and BESS | Converse | 998 MW | n/a |
| Cowboy Solar I | Laramie | 800 MW | n/a |
| Cowboy Solar II | Laramie | 565 MW | n/a |
| Rail Tie Wind | Albany | 504 MW | n/a |
| Kemmerer Unit 1 | Lincoln | 500 MW | n/a |
| Goshen Solar | Goshen | 163 MW | n/a |
| Two Rivers Wind Facility | Carbon | 6.1 MW | n/a |
| Rock River I LLC | Carbon | n/a | 50 MW |
| Foote Creek I | Carbon | n/a | 41.4 MW |
| Osage (WY) | Weston | n/a | 34.5 MW |
| Foote Creek III | Carbon | n/a | 24.8 MW |
| Neil Simpson | Campbell | n/a | 21.7 MW |
| Foote Creek IV | Carbon | n/a | 16.8 MW |
| Medicine Bow | Carbon | n/a | 8.8 MW |
| Western Sugar Coop - Torrington | Goshen | n/a | 2 MW |
| Foote Creek II | Carbon | n/a | 1.8 MW |
| Uinta Wind | Uinta | n/a | n/a |
Source: EIA Form EIA-860, 2025 final.