Wind power plant, Wyoming
Pioneer Wind Park, LLC power plant, Wyoming
Pioneer Wind Park, LLC is a 80 MW wind power plant in Converse County, Wyoming, operated by AES Distributed Energy, and it generated 252,550 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.6% of the generation reported in Wyoming, and its capacity factor sits at the 60th percentile of U.S. wind plants. By 2025 generation it ranks 2,218th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Pioneer Wind Park, LLC plant run compared with other wind plants?
The Pioneer Wind Park, LLC plant had a capacity factor of 36% in 2025 on 80 MW of net summer capacity, the 60th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 132 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Pioneer Wind Park, LLC | 36% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Pioneer Wind Park, LLC plant generating more or less than last year?
Generation at Pioneer Wind Park, LLC fell 7.5% from 2024 to 2025, from 273,017 MWh to 252,550 MWh.
| Period | MWh |
|---|---|
| 2024 | 273,017 |
| 2025 | 252,550 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 38,580 |
| November 2025 | 28,536 |
| October 2025 | 24,358 |
| September 2025 | 12,661 |
| August 2025 | 9,786 |
| July 2025 | 12,683 |
| June 2025 | 10,529 |
| May 2025 | 16,477 |
| April 2025 | 18,401 |
| March 2025 | 28,812 |
| February 2025 | 21,182 |
| January 2025 | 30,545 |
| December 2024 | 36,502 |
| November 2024 | 32,123 |
| October 2024 | 19,512 |
| September 2024 | 16,309 |
| August 2024 | 20,292 |
| July 2024 | 10,401 |
| June 2024 | 16,819 |
| May 2024 | 19,899 |
| April 2024 | 20,036 |
| March 2024 | 24,305 |
| February 2024 | 28,013 |
| January 2024 | 28,806 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Pioneer Wind Park, LLC plant, and when do they retire?
1 operable generator totals 80 MW, with an average age of 9 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 80 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| PWP1 | Operating | Onshore Wind Turbine | 80 | 2016 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Pioneer Wind Park, LLC plant?
EIA lists no joint owners for Pioneer Wind Park, LLC. AES Distributed Energy operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Pioneer Wind Park, LLC plant?
Pioneer Wind Park, LLC is in Glenrock, Converse County, Wyoming, at 42.7282° N, 105.8668° W. It sits in the PacifiCorp - East balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Wyoming are similar in size?
Wyoming has 28 operable wind plants with 4,707 MW of capacity, and Pioneer Wind Park, LLC's 80 MW is 2% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Roundhouse Renewable Energy II | Laramie | 106 | 376,380 |
| Campbell Hill Windpower | Converse | 99 | 253,677 |
| Mountain Wind Power II LLC | Uinta | 80 | 187,778 |
| Pioneer Wind Park, LLC | Converse | 80 | 252,550 |
| Mountain Wind Power LLC | Uinta | 61 | 151,420 |
| Corriedale Wind Energy | Laramie | 53 | 214,312 |
| Silver Sage Windpower | Laramie | 42 | 100,242 |
Source: EIA Forms EIA-860 and EIA-923, 2025.