Skip to main content
RateWatt

Wind power plant, Wyoming

Silver Sage Windpower wind power plant, Wyoming

Silver Sage Windpower is a 42 MW wind power plant in Laramie County, Wyoming, operated by Deriva Energy, and it generated 100,242 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Wyoming, and its capacity factor sits at the 29th percentile of U.S. wind plants. By 2025 generation it ranks 3,388th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

42 MWNameplate capacity
27%Capacity factor, 2025, 29th percentile, on 42 MW net summer
0.2%Of WY generation, 2025
16 yearsAverage generator age, by MW

How hard does the Silver Sage Windpower plant run compared with other wind plants?

The Silver Sage Windpower plant had a capacity factor of 27% in 2025 on 42 MW of net summer capacity, the 29th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 99 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Silver Sage Windpower27%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Silver Sage Windpower plant generating more or less than last year?

Generation at Silver Sage Windpower fell 7.9% from 2024 to 2025, from 108,803 MWh to 100,242 MWh. Through August 2026 it is running 6.0% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024108,803
2025100,242
2026 through August71,098
2025, same months67,099
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 20264,468
July 20264,103
June 20267,358
May 20268,151
April 20269,581
March 202612,913
February 202610,651
January 202613,873
December 202513,731
November 202512,262
October 20254,496
September 20252,654
August 20255,082
July 20255,018
June 20252,596
May 20258,848
April 20259,261
March 202512,494
February 202510,651
January 202513,149
December 202414,076
November 202412,713
October 20247,573
September 20245,857
August 20244,660
July 20243,345
June 20249,654
May 202410,472
April 202410,436
March 20249,039
February 202411,034
January 20249,944

Source: EIA Form EIA-923, through August 2026.

How much of Wyoming's electricity comes from the Silver Sage Windpower plant?

Silver Sage Windpower made 0.2% of the 45,576,517 MWh reported by Wyoming plants in 2025, from 0.3% of the state's 12,736 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 41st largest of 71 plants in Wyoming, the 4,033rd largest of 14,327 in the U.S. and the 911th largest of 1,358 wind plants. By 2025 generation it is the 44th largest of 69 generating plants in the state.

Silver Sage Windpower within Wyoming, 2025
MeasureThis plantWyomingShare
Capacity (MW)4212,7360.3%
Generation (MWh)100,24245,576,5170.2%
Wind capacity (MW)424,7070.9%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Silver Sage Windpower plant, and when do they retire?

1 operable generator totals 42 MW, with an average age of 16 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s142100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
SSW01OperatingOnshore Wind Turbine422009n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Silver Sage Windpower plant?

EIA lists no joint owners for Silver Sage Windpower. Deriva Energy operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Silver Sage Windpower plant?

Silver Sage Windpower is in Cheyenne, Laramie County, Wyoming, at 41.1297° N, 105.0240° W. It sits in the Western Area Power Administration UGP West balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Wyoming are similar in size?

Wyoming has 28 operable wind plants with 4,707 MW of capacity, and Silver Sage Windpower's 42 MW is 1% of that.

Wind plants in Wyoming around this size
PlantCountyMW2025 MWh
Pioneer Wind Park, LLCConverse80252,550
Mountain Wind Power LLCUinta61151,420
Corriedale Wind EnergyLaramie53214,312
Silver Sage WindpowerLaramie42100,242
McFadden RidgeAlbany35104,770
Happy Jack Windpower ProjectLaramie2958,706