Skip to main content
RateWatt

Wind power plant, Wyoming

Happy Jack Windpower Project, Wyoming

Happy Jack Windpower Project is a 29.4 MW wind power plant in Laramie County, Wyoming, operated by Deriva Energy, and it generated 58,706 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Wyoming, and its capacity factor sits at the 16th percentile of U.S. wind plants. By 2025 generation it ranks 3,894th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

29.4 MWNameplate capacity
23%Capacity factor, 2025, 16th percentile, on 29.4 MW net summer
0.1%Of WY generation, 2025
17 yearsAverage generator age, by MW

How hard does the Happy Jack Windpower Project plant run compared with other wind plants?

The Happy Jack Windpower Project plant had a capacity factor of 23% in 2025 on 29.4 MW of net summer capacity, the 16th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 83 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Happy Jack Windpower Project23%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Happy Jack Windpower Project plant generating more or less than last year?

Generation at Happy Jack Windpower Project rose 3.4% from 2024 to 2025, from 56,779 MWh to 58,706 MWh. Through August 2026 it is running 18.7% ahead of the same months of 2025.

Net generation by period
PeriodMWh
202456,779
202558,706
2026 through August46,342
2025, same months39,057
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 20262,650
July 20262,438
June 20264,617
May 20265,049
April 20266,223
March 20268,550
February 20266,297
January 202610,518
December 20258,524
November 20257,290
October 20252,443
September 20251,392
August 20252,657
July 20253,530
June 20251,676
May 20254,946
April 20255,524
March 20256,475
February 20256,297
January 20257,952
December 20248,094
November 20247,077
October 20243,684
September 20242,627
August 20242,104
July 20242,306
June 20244,587
May 20245,522
April 20245,635
March 20244,538
February 20245,365
January 20245,240

Source: EIA Form EIA-923, through August 2026.

How much of Wyoming's electricity comes from the Happy Jack Windpower Project plant?

Happy Jack Windpower Project made 0.1% of the 45,576,517 MWh reported by Wyoming plants in 2025, from 0.2% of the state's 12,736 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 49th largest of 71 plants in Wyoming, the 4,423rd largest of 14,327 in the U.S. and the 965th largest of 1,358 wind plants. By 2025 generation it is the 49th largest of 69 generating plants in the state.

Happy Jack Windpower Project within Wyoming, 2025
MeasureThis plantWyomingShare
Capacity (MW)2912,7360.2%
Generation (MWh)58,70645,576,5170.1%
Wind capacity (MW)294,7070.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Happy Jack Windpower Project plant, and when do they retire?

1 operable generator totals 29.4 MW, with an average age of 17 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s129100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
HJW01OperatingOnshore Wind Turbine292008n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Happy Jack Windpower Project plant?

Duke Energy DEGS Happy Jack is the only joint owner reported for Happy Jack Windpower Project, with 100.0%. Deriva Energy operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Happy Jack Windpower Project plant?

Happy Jack Windpower Project is in Cheyenne, Laramie County, Wyoming, at 41.1397° N, 104.9978° W. It sits in the Western Area Power Administration UGP West balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Wyoming are similar in size?

Wyoming has 28 operable wind plants with 4,707 MW of capacity, and Happy Jack Windpower Project's 29.4 MW is 1% of that.

Wind plants in Wyoming around this size
PlantCountyMW2025 MWh
Corriedale Wind EnergyLaramie53214,312
Silver Sage WindpowerLaramie42100,242
McFadden RidgeAlbany35104,770
Happy Jack Windpower ProjectLaramie2958,706
Casper Wind FarmNatrona170

Source: EIA Forms EIA-860 and EIA-923, 2025.