Wind power plant, Wyoming
Mountain Wind Power II LLC power plant, Wyoming
Mountain Wind Power II LLC is a 80 MW wind power plant in Uinta County, Wyoming, operated by Mountain Wind Power II LLC, and it generated 187,778 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.4% of the generation reported in Wyoming, and its capacity factor sits at the 28th percentile of U.S. wind plants. By 2025 generation it ranks 2,579th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Mountain Wind Power II LLC plant run compared with other wind plants?
The Mountain Wind Power II LLC plant had a capacity factor of 27% in 2025 on 80 MW of net summer capacity, the 28th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 98 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Mountain Wind Power II LLC | 27% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Mountain Wind Power II LLC plant generating more or less than last year?
Generation at Mountain Wind Power II LLC rose 10.4% from 2024 to 2025, from 170,130 MWh to 187,778 MWh. Through August 2026 it is running 2.7% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 170,130 |
| 2025 | 187,778 |
| 2026 through August | 116,882 |
| 2025, same months | 113,805 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 8,790 |
| July 2026 | 4,344 |
| June 2026 | 16,106 |
| May 2026 | 9,522 |
| April 2026 | 16,545 |
| March 2026 | 22,830 |
| February 2026 | 13,335 |
| January 2026 | 25,410 |
| December 2025 | 33,468 |
| November 2025 | 19,375 |
| October 2025 | 15,072 |
| September 2025 | 6,058 |
| August 2025 | 8,042 |
| July 2025 | 9,520 |
| June 2025 | 11,472 |
| May 2025 | 10,277 |
| April 2025 | 11,541 |
| March 2025 | 18,492 |
| February 2025 | 24,695 |
| January 2025 | 19,766 |
| December 2024 | 21,138 |
| November 2024 | 13,397 |
| October 2024 | 5,331 |
| September 2024 | 7,337 |
| August 2024 | 9,600 |
| July 2024 | 8,161 |
| June 2024 | 13,671 |
| May 2024 | 18,929 |
| April 2024 | 16,656 |
| March 2024 | 19,354 |
| February 2024 | 18,246 |
| January 2024 | 18,310 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Mountain Wind Power II LLC plant, and when do they retire?
1 operable generator totals 80 MW, with an average age of 17 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2000s | 1 | 80 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 1 | Operating | Onshore Wind Turbine | 80 | 2008 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Mountain Wind Power II LLC plant?
2 owners report shares in Mountain Wind Power II LLC; Edison Mission Energy holds the largest named share, 80.1% or about 64.1 MW. Mountain Wind Power II LLC operates the plant.
| Owner | Share | MW | 2025 MWh, by share |
|---|---|---|---|
| Edison Mission Energy | 80.1% | 64 | 150,410 |
| NRG Energy, Inc | 19.9% | 16 | 37,368 |
Source: EIA Form EIA-860, Owner, 2025 final. MW and MWh by share multiply the plant totals by each owner's percentage.
Where is the Mountain Wind Power II LLC plant?
Mountain Wind Power II LLC is in Fort Bridger, Uinta County, Wyoming, at 41.2639° N, 110.5444° W. It sits in the PacifiCorp - East balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Wyoming are similar in size?
Wyoming has 28 operable wind plants with 4,707 MW of capacity, and Mountain Wind Power II LLC's 80 MW is 2% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Rolling Hills | Converse | 116 | 295,088 |
| Roundhouse Renewable Energy II | Laramie | 106 | 376,380 |
| Campbell Hill Windpower | Converse | 99 | 253,677 |
| Mountain Wind Power II LLC | Uinta | 80 | 187,778 |
| Pioneer Wind Park, LLC | Converse | 80 | 252,550 |
| Mountain Wind Power LLC | Uinta | 61 | 151,420 |
| Corriedale Wind Energy | Laramie | 53 | 214,312 |
Source: EIA Forms EIA-860 and EIA-923, 2025.