Solar power plant, Wyoming
South Cheyenne Solar power plant, Wyoming
South Cheyenne Solar is a 150 MW solar power plant in Laramie County, Wyoming, operated by Southern Power Co, and it generated 322,715 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.7% of the generation reported in Wyoming, and its capacity factor sits at the 61st percentile of U.S. solar plants. By 2025 generation it ranks 1,869th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the South Cheyenne Solar plant run compared with other solar plants?
The South Cheyenne Solar plant had a capacity factor of 25% in 2025 on 150 MW of net summer capacity, the 61st percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 90 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| South Cheyenne Solar | 25% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the South Cheyenne Solar plant generating more or less than last year?
South Cheyenne Solar generated 322,715 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 1.3% behind the same months of 2025. 2024 has output for only 9 months, so the two years are not compared.
| Period | MWh |
|---|---|
| 2024 | 242,259 |
| 2025 | 322,715 |
| 2026 through August | 238,879 |
| 2025, same months | 241,952 |
Monthly generation, Apr 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 32,777 |
| July 2026 | 41,497 |
| June 2026 | 41,112 |
| May 2026 | 36,364 |
| April 2026 | 25,338 |
| March 2026 | 27,344 |
| February 2026 | 19,794 |
| January 2026 | 14,653 |
| December 2025 | 13,360 |
| November 2025 | 16,280 |
| October 2025 | 22,182 |
| September 2025 | 28,941 |
| August 2025 | 34,104 |
| July 2025 | 36,118 |
| June 2025 | 37,884 |
| May 2025 | 33,298 |
| April 2025 | 32,651 |
| March 2025 | 29,282 |
| February 2025 | 20,955 |
| January 2025 | 17,660 |
| December 2024 | 14,877 |
| November 2024 | 18,460 |
| October 2024 | 25,885 |
| September 2024 | 35,355 |
| August 2024 | 35,550 |
| July 2024 | 37,788 |
| June 2024 | 34,915 |
| May 2024 | 34,792 |
| April 2024 | 4,637 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the South Cheyenne Solar plant, and when do they retire?
1 operable generator totals 150 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 150 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| SCHY | Operating | Solar Photovoltaic | 150 | 2024 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the South Cheyenne Solar plant?
EIA lists no joint owners for South Cheyenne Solar. Southern Power Co operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the South Cheyenne Solar plant?
South Cheyenne Solar is in South Greeley, Laramie County, Wyoming, at 41.0272° N, 104.7760° W. It sits in the Western Area Power Administration - Rocky Mountain Region balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Wyoming are similar in size?
Wyoming has 2 operable solar plants with 242 MW of capacity, and South Cheyenne Solar's 150 MW is 62% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| South Cheyenne Solar | Laramie | 150 | 322,715 |
| Sweetwater Solar | Sweetwater | 92 | 173,282 |
Source: EIA Forms EIA-860 and EIA-923, 2025.