Solar power plant, Wyoming

South Cheyenne Solar power plant, Wyoming

South Cheyenne Solar is a 150 MW solar power plant in Laramie County, Wyoming, operated by Southern Power Co, and it generated 322,715 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.7% of the generation reported in Wyoming, and its capacity factor sits at the 61st percentile of U.S. solar plants. By 2025 generation it ranks 1,869th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

150 MWNameplate capacity
25%Capacity factor, 2025, 61st percentile, on 150 MW net summer
0.7%Of WY generation, 2025
1 yearAverage generator age, by MW

How hard does the South Cheyenne Solar plant run compared with other solar plants?

The South Cheyenne Solar plant had a capacity factor of 25% in 2025 on 150 MW of net summer capacity, the 61st percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 90 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
South Cheyenne Solar25%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the South Cheyenne Solar plant generating more or less than last year?

South Cheyenne Solar generated 322,715 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 1.3% behind the same months of 2025. 2024 has output for only 9 months, so the two years are not compared.

Net generation by period
PeriodMWh
2024242,259
2025322,715
2026 through August238,879
2025, same months241,952
Monthly generation, Apr 2024 to Aug 2026
MonthMWh
August 202632,777
July 202641,497
June 202641,112
May 202636,364
April 202625,338
March 202627,344
February 202619,794
January 202614,653
December 202513,360
November 202516,280
October 202522,182
September 202528,941
August 202534,104
July 202536,118
June 202537,884
May 202533,298
April 202532,651
March 202529,282
February 202520,955
January 202517,660
December 202414,877
November 202418,460
October 202425,885
September 202435,355
August 202435,550
July 202437,788
June 202434,915
May 202434,792
April 20244,637

Source: EIA Form EIA-923, through August 2026.

How much of Wyoming's electricity comes from the South Cheyenne Solar plant?

South Cheyenne Solar made 0.7% of the 45,576,517 MWh reported by Wyoming plants in 2025, from 1.2% of the state's 12,736 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 17th largest of 71 plants in Wyoming, the 1,967th largest of 14,327 in the U.S. and the 295th largest of 7,223 solar plants. By 2025 generation it is the 28th largest of 69 generating plants in the state.

South Cheyenne Solar within Wyoming, 2025
MeasureThis plantWyomingShare
Capacity (MW)15012,7361.2%
Generation (MWh)322,71545,576,5170.7%
Solar capacity (MW)15024262.0%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the South Cheyenne Solar plant, and when do they retire?

1 operable generator totals 150 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1150100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
SCHYOperatingSolar Photovoltaic1502024n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the South Cheyenne Solar plant?

EIA lists no joint owners for South Cheyenne Solar. Southern Power Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the South Cheyenne Solar plant?

South Cheyenne Solar is in South Greeley, Laramie County, Wyoming, at 41.0272° N, 104.7760° W. It sits in the Western Area Power Administration - Rocky Mountain Region balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Wyoming are similar in size?

Wyoming has 2 operable solar plants with 242 MW of capacity, and South Cheyenne Solar's 150 MW is 62% of that.

Solar plants in Wyoming around this size
PlantCountyMW2025 MWh
South Cheyenne SolarLaramie150322,715
Sweetwater SolarSweetwater92173,282

Source: EIA Forms EIA-860 and EIA-923, 2025.