Solar power plant, Wyoming
Sweetwater Solar power plant, Wyoming
Sweetwater Solar is a 92 MW solar power plant in Sweetwater County, Wyoming, operated by Onward Energy, and it generated 173,282 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.4% of the generation reported in Wyoming, and its capacity factor sits at the 37th percentile of U.S. solar plants. By 2025 generation it ranks 2,692nd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Sweetwater Solar plant run compared with other solar plants?
The Sweetwater Solar plant had a capacity factor of 22% in 2025 on 92 MW of net summer capacity, the 37th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 78 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Sweetwater Solar | 22% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Sweetwater Solar plant generating more or less than last year?
Generation at Sweetwater Solar fell 4.2% from 2024 to 2025, from 180,890 MWh to 173,282 MWh. Through August 2026 it is running 1.2% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 180,890 |
| 2025 | 173,282 |
| 2026 through August | 130,685 |
| 2025, same months | 129,173 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 17,363 |
| July 2026 | 20,610 |
| June 2026 | 23,072 |
| May 2026 | 20,581 |
| April 2026 | 16,912 |
| March 2026 | 15,076 |
| February 2026 | 9,801 |
| January 2026 | 7,270 |
| December 2025 | 6,293 |
| November 2025 | 8,438 |
| October 2025 | 13,126 |
| September 2025 | 16,252 |
| August 2025 | 17,693 |
| July 2025 | 19,941 |
| June 2025 | 22,875 |
| May 2025 | 19,752 |
| April 2025 | 18,067 |
| March 2025 | 13,441 |
| February 2025 | 9,002 |
| January 2025 | 8,402 |
| December 2024 | 6,483 |
| November 2024 | 8,278 |
| October 2024 | 13,151 |
| September 2024 | 17,502 |
| August 2024 | 19,714 |
| July 2024 | 23,137 |
| June 2024 | 22,124 |
| May 2024 | 20,719 |
| April 2024 | 19,169 |
| March 2024 | 13,641 |
| February 2024 | 10,770 |
| January 2024 | 6,202 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Sweetwater Solar plant, and when do they retire?
1 operable generator totals 92 MW, with an average age of 7 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 92 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| PV1 | Operating | Solar Photovoltaic | 92 | 2018 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Sweetwater Solar plant?
174 Power Global Corp. is the only joint owner reported for Sweetwater Solar, with 100.0%. Onward Energy operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Sweetwater Solar plant?
Sweetwater Solar is in Green River, Sweetwater County, Wyoming, at 41.6291° N, 109.6835° W. It sits in the PacifiCorp - East balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Wyoming are similar in size?
Wyoming has 2 operable solar plants with 242 MW of capacity, and Sweetwater Solar's 92 MW is 38% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| South Cheyenne Solar | Laramie | 150 | 322,715 |
| Sweetwater Solar | Sweetwater | 92 | 173,282 |
Source: EIA Forms EIA-860 and EIA-923, 2025.