Wind power plant, Wyoming

Cedar Springs II wind power plant, Wyoming

Cedar Springs II is a 200 MW wind power plant in Converse County, Wyoming, operated by PacifiCorp, and it generated 652,391 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.4% of the generation reported in Wyoming, and its capacity factor sits at the 65th percentile of U.S. wind plants. By 2025 generation it ranks 1,050th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

200 MWNameplate capacity
37%Capacity factor, 2025, 65th percentile, on 199 MW net summer
1.4%Of WY generation, 2025
5 yearsAverage generator age, by MW

How hard does the Cedar Springs II plant run compared with other wind plants?

The Cedar Springs II plant had a capacity factor of 37% in 2025 on 199 MW of net summer capacity, the 65th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 137 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Cedar Springs II37%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Cedar Springs II plant generating more or less than last year?

Generation at Cedar Springs II rose 8.7% from 2024 to 2025, from 599,952 MWh to 652,391 MWh. Through August 2026 it is running 23.4% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024599,952
2025652,391
2026 through August484,046
2025, same months392,262
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202639,300
July 202638,352
June 202647,204
May 202657,523
April 202660,867
March 202673,961
February 202672,784
January 202694,055
December 202595,219
November 202560,533
October 202561,461
September 202542,916
August 202540,483
July 202540,063
June 202536,113
May 202547,683
April 202547,524
March 202562,070
February 202547,163
January 202571,163
December 202472,880
November 202462,652
October 202440,751
September 202441,727
August 202433,108
July 202426,671
June 202458,043
May 202454,789
April 202451,515
March 202457,081
February 202452,155
January 202448,580

Source: EIA Form EIA-923, through August 2026.

How much of Wyoming's electricity comes from the Cedar Springs II plant?

Cedar Springs II made 1.4% of the 45,576,517 MWh reported by Wyoming plants in 2025, from 1.6% of the state's 12,736 MW of capacity. By capacity it is the 13th largest of 71 plants in Wyoming, the 1,524th largest of 14,327 in the U.S. and the 314th largest of 1,358 wind plants. By 2025 generation it is the 14th largest of 69 generating plants in the state.

Cedar Springs II within Wyoming, 2025
MeasureThis plantWyomingShare
Capacity (MW)20012,7361.6%
Generation (MWh)652,39145,576,5171.4%
Wind capacity (MW)2004,7074.2%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Cedar Springs II plant, and when do they retire?

1 operable generator totals 200 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1200100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
82634OperatingOnshore Wind Turbine2002020n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Cedar Springs II plant?

EIA lists no joint owners for Cedar Springs II. PacifiCorp operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does PacifiCorp charge homes?

PacifiCorp, the operator of Cedar Springs II, had an average residential price of 15.13¢ per kWh and an average bill of $107 a month in 2025, 13% above the Wyoming average of 13.37¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Wyoming
PacifiCorp15.13¢$10713% higher
Wyoming average13.37¢$112
U.S. average17.23¢$15129% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Cedar Springs II plant?

Cedar Springs II is in Douglas, Converse County, Wyoming, at 42.9690° N, 105.3656° W. It sits in the PacifiCorp - East balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Wyoming are similar in size?

Wyoming has 28 operable wind plants with 4,707 MW of capacity, and Cedar Springs II's 200 MW is 4% of that.

Wind plants in Wyoming around this size
PlantCountyMW2025 MWh
Roundhouse Wind Energy ProjectLaramie226826,429
Top of the World Windpower ProjectConverse200495,841
Cedar Springs IConverse200699,700
Cedar Springs IIConverse200652,391
GlenrockConverse166469,225
Seven Mile HillCarbon146458,287
TransAlta Wyoming WindUinta144321,444

Source: EIA Forms EIA-860 and EIA-923, 2025.