Skip to main content
RateWatt

Hydro power plant, Wyoming

Glendo hydroelectric power plant, Wyoming

Glendo is a 38 MW hydro power plant in Platte County, Wyoming, operated by U S Bureau of Reclamation, and it generated 67,348 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Wyoming, and its capacity factor sits at the 21st percentile of U.S. hydro plants. By 2025 generation it ranks 3,780th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

38 MWNameplate capacity
20%Capacity factor, 2025, 21st percentile, on 38 MW net summer
0.1%Of WY generation, 2025
67 yearsAverage generator age, by MW

How hard does the Glendo plant run compared with other hydro plants?

The Glendo plant had a capacity factor of 20% in 2025 on 38 MW of net summer capacity, the 21st percentile of the 427 U.S. hydro plants with at least 20 MW. The typical hydro plant reached 33%. That equals about 74 days at full output out of 365.

0%Shaded: the middle half of hydro plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Glendo20%
Hydro plants, 75th percentile44%
Hydro plants, median33%
Hydro plants, 25th percentile22%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Glendo plant generating more or less than last year?

Glendo generated 67,348 MWh in 2025; EIA reports no 2024 total to compare. 2024 has output for only 6 months, so the two years are not compared.

12 months show net generation below zero, when the plant used more power than it sent out, so the months are listed below rather than charted.

Net generation by period
PeriodMWh
202487,747
202567,348
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 2025-100
November 2025-68
October 2025-43
September 20253,503
August 202519,277
July 202522,610
June 20257,605
May 202511,055
April 20253,801
March 2025-66
February 2025-106
January 2025-120
December 2024-89
November 2024-74
October 2024-36
September 20247,964
August 202418,993
July 202420,485
June 202421,341
May 202417,535
April 20241,951
March 2024-74
February 2024-97
January 2024-152

Source: EIA Form EIA-923, through August 2026.

How much of Wyoming's electricity comes from the Glendo plant?

Glendo made 0.1% of the 45,576,517 MWh reported by Wyoming plants in 2025, from 0.3% of the state's 12,736 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 45th largest of 71 plants in Wyoming, the 4,170th largest of 14,327 in the U.S. and the 323rd largest of 1,393 hydro plants. By 2025 generation it is the 48th largest of 69 generating plants in the state.

Glendo within Wyoming, 2025
MeasureThis plantWyomingShare
Capacity (MW)3812,7360.3%
Generation (MWh)67,34845,576,5170.1%
Hydro capacity (MW)3830312.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Glendo plant, and when do they retire?

2 operable generators total 38 MW, with an average age of 67 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1950s238100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingConventional Hydroelectric191958n/a
2OperatingConventional Hydroelectric191959n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Glendo plant?

EIA lists no joint owners for Glendo. U S Bureau of Reclamation operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Glendo plant?

Glendo is in Glendo, Platte County, Wyoming, at 42.4673° N, 104.9555° W. It sits in the Western Area Power Administration UGP West balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which hydro plants in Wyoming are similar in size?

Wyoming has 16 operable hydro plants with 303 MW of capacity, and Glendo's 38 MW is 13% of that.

Hydro plants in Wyoming around this size
PlantCountyMW2025 MWh
Fremont CanyonNatrona67233,507
SeminoeCarbon5284,528
AlcovaNatrona41107,154
GlendoPlatte3867,348
KortesCarbon36105,700

Source: EIA Forms EIA-860 and EIA-923, 2025.