Skip to main content
RateWatt

Natural gas power plant, Wisconsin

De Pere Energy Center, Wisconsin

De Pere Energy Center is a 192 MW natural gas power plant in Brown County, Wisconsin, operated by Wisconsin Public Service Corp, and it generated 180,193 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in Wisconsin, and its capacity factor sits at the 30th percentile of U.S. natural gas plants. By 2025 generation it ranks 2,645th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

192 MWNameplate capacity
7%Capacity factor, 2025, 30th percentile, on 166 MW net summer
0.3%Of WI generation, 2025
26 yearsAverage generator age, by MW

How hard does the De Pere Energy Center plant run compared with other natural gas plants?

The De Pere Energy Center plant had a capacity factor of 7% in 2025 on 166 MW of net summer capacity, the 30th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 27 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
De Pere Energy Center7%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the De Pere Energy Center plant generating more or less than last year?

Generation at De Pere Energy Center rose 30.6% from 2024 to 2025, from 137,999 MWh to 180,193 MWh.

Net generation by period
PeriodMWh
2024137,999
2025180,193
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202517,223
November 202515,612
October 202511,796
September 202515,432
August 202516,638
July 202518,133
June 202517,955
May 202513,511
April 202511,900
March 202511,233
February 202515,412
January 202515,350
December 202412,549
November 202411,375
October 20249,369
September 202411,784
August 202412,673
July 202412,871
June 202412,305
May 202411,760
April 20249,162
March 202411,884
February 20249,766
January 202412,502

Source: EIA Form EIA-923, through August 2026.

How much of Wisconsin's electricity comes from the De Pere Energy Center plant?

De Pere Energy Center made 0.3% of the 66,249,756 MWh reported by Wisconsin plants in 2025, from 1.0% of the state's 19,442 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 25th largest of 273 plants in Wisconsin, the 1,688th largest of 14,327 in the U.S. and the 721st largest of 1,962 natural gas plants. By 2025 generation it is the 38th largest of 259 generating plants in the state.

De Pere Energy Center within Wisconsin, 2025
MeasureThis plantWisconsinShare
Capacity (MW)19219,4421.0%
Generation (MWh)180,19366,249,7560.3%
Natural gas capacity (MW)1927,8242.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the De Pere Energy Center plant, and when do they retire?

1 operable generator totals 192 MW, with an average age of 26 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1990s1192100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
CT01OperatingNatural Gas Fired Combustion Turbine1921999n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the De Pere Energy Center plant?

EIA lists no joint owners for De Pere Energy Center. Wisconsin Public Service Corp operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Wisconsin Public Service Corp charge homes?

Wisconsin Public Service Corp, the operator of De Pere Energy Center, had an average residential price of 17.20¢ per kWh and an average bill of $106 a month in 2025, 5% below the Wisconsin average of 18.08¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Wisconsin
Wisconsin Public Service Corp17.20¢$1065% lower
Wisconsin average18.08¢$121
U.S. average17.23¢$1515% lower

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the De Pere Energy Center plant?

De Pere Energy Center is in De Pere, Brown County, Wisconsin, at 44.4486° N, 88.0720° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region RFC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in Wisconsin are similar in size?

Wisconsin has 38 operable natural gas plants with 7,824 MW of capacity, and De Pere Energy Center's 192 MW is 2% of that.

Natural gas plants in Wisconsin around this size
PlantCountyMW2025 MWh
Sheboygan FallsSheboygan347452,483
Whitewater Generating StationJefferson284748,227
Valley (WI)Milwaukee272369,729
De Pere Energy CenterBrown192107,872
West MarinetteMarinette18790,259
West Campus Cogeneration FacilityDane169305,079
Weston RICEMarathon132144,470

Source: EIA Forms EIA-860 and EIA-923, 2025.