Solar power plant, Florida

Debary Solar Power Plant, Florida

Debary Solar Power Plant is a 74.5 MW solar power plant in Volusia County, Florida, operated by Duke Energy Florida, LLC, and it generated 126,812 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 22nd percentile of U.S. solar plants. By 2025 generation it ranks 3,131st of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

74.5 MWNameplate capacity
19%Capacity factor, 2025, 22nd percentile, on 74.5 MW net summer
3,131stU.S. rank by generation, 2025
5 yearsAverage generator age, by MW

How hard does Debary Solar Power Plant run compared with other solar plants?

Debary Solar Power Plant had a capacity factor of 19% in 2025 on 74.5 MW of net summer capacity, the 22nd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 71 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Debary Solar Power Plant19%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is Debary Solar Power Plant generating more or less than last year?

Generation at Debary Solar Power Plant rose 7.9% from 2024 to 2025, from 117,531 MWh to 126,812 MWh. Through August 2026 it is running 4.9% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024117,531
2025126,812
2026 through August90,961
2025, same months86,689
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202613,429
July 202610,336
June 202611,683
May 202612,102
April 202612,575
March 202612,457
February 20269,146
January 20269,233
December 20258,748
November 202510,964
October 202510,237
September 202510,174
August 202511,224
July 202511,505
June 202510,703
May 202511,050
April 202511,546
March 202512,556
February 20259,229
January 20258,876
December 20248,699
November 20249,202
October 20248,819
September 20248,213
August 20249,941
July 202410,647
June 20248,456
May 202412,241
April 202412,881
March 202411,051
February 20249,753
January 20247,628

Source: EIA Form EIA-923, through August 2026.

How much of Florida's electricity comes from Debary Solar Power Plant?

Debary Solar Power Plant made 0.0% of the 267,867,735 MWh reported by Florida plants in 2025, from 0.1% of the state's 79,936 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 105th largest of 331 plants in Florida, the 3,163rd largest of 14,327 in the U.S. and the 646th largest of 7,223 solar plants. By 2025 generation it is the 205th largest of 313 generating plants in the state.

Debary Solar Power Plant within Florida, 2025
MeasureThis plantFloridaShare
Capacity (MW)7579,9360.1%
Generation (MWh)126,812267,867,7350.0%
Solar capacity (MW)7512,2230.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at Debary Solar Power Plant, and when do they retire?

1 operable generator totals 74.5 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s175100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
PV1OperatingSolar Photovoltaic752020n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns Debary Solar Power Plant?

EIA lists no joint owners for Debary Solar Power Plant. Duke Energy Florida, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Duke Energy Florida, LLC charge homes?

Duke Energy Florida, LLC, the operator of Debary Solar Power Plant, had an average residential price of 18.36¢ per kWh and an average bill of $185 a month in 2025, 21% above the Florida average of 15.21¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Florida
Duke Energy Florida, LLC18.36¢$18521% higher
Florida average15.21¢$168
U.S. average17.23¢$15113% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is Debary Solar Power Plant?

Debary Solar Power Plant is in DeBary, Volusia County, Florida, at 28.8995° N, 81.3309° W. It sits in the Duke Energy Florida Inc balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Florida are similar in size?

Florida has 210 operable solar plants with 12,223 MW of capacity, and Debary Solar Power Plant's 74.5 MW is 1% of that.

Solar plants in Florida around this size
PlantCountyMW2025 MWh
Echo River SolarSuwannee75162,949
Okeechobee SolarOkeechobee75149,162
Southfork SolarManatee75144,690
Debary Solar Power PlantVolusia75126,812
Blue Heron SolarHendry75154,302
Cattle RanchDeSoto75146,676
Twin LakesPutnam75122,507

Source: EIA Forms EIA-860 and EIA-923, 2025.