Echo River Solar is a 105 MW power plant, 74.5 MW of it solar, in Suwannee County, Florida, operated by Florida Power & Light Co, and it generated 161,173 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Florida, and its capacity factor sits at the 64th percentile of U.S. solar plants. By 2025 generation it ranks 2,799th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

105 MWNameplate capacity
25%Capacity factor, 2025, solar units, 64th percentile, on 74.5 MW net summer
0.1%Of FL generation, 2025
5 yearsAverage generator age, by MW

How hard does the Echo River Solar plant run compared with other solar plants?

The Echo River Solar plant's solar units had a capacity factor of 25% in 2025 on 74.5 MW of net summer capacity, the 64th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 91 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Echo River Solar25%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the Echo River Solar plant generating more or less than last year?

Generation at Echo River Solar rose 9.2% from 2024 to 2025, from 147,551 MWh to 161,173 MWh. Through August 2026 it is running 7.7% behind the same months of 2025.

Net generation by period
PeriodMWh
2024147,551
2025161,173
2026 through August106,220
2025, same months115,100
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202613,850
July 202615,706
June 202614,669
May 202613,554
April 202614,936
March 202613,820
February 202610,832
January 20268,853
December 20258,410
November 202511,594
October 202512,632
September 202513,437
August 202513,476
July 202516,755
June 202515,697
May 202516,785
April 202517,851
March 202515,055
February 20259,813
January 20259,668
December 20248,803
November 20248,170
October 20248,031
September 20248,651
August 202414,487
July 202414,014
June 202415,767
May 202416,440
April 202417,965
March 202414,721
February 202411,906
January 20248,596

Source: EIA Form EIA-923, through August 2026.

How much of Florida's electricity comes from the Echo River Solar plant?

Echo River Solar made 0.1% of the 267,867,735 MWh reported by Florida plants in 2025, from 0.1% of the state's 79,936 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 70th largest of 331 plants in Florida, the 2,508th largest of 14,327 in the U.S. and the 643rd largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 133rd largest of 313 generating plants in the state.

Echo River Solar within Florida, 2025
MeasureThis plantFloridaShare
Capacity (MW)10579,9360.1%
Generation (MWh)161,173267,867,7350.1%
Solar capacity (MW)7512,2230.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Echo River Solar plant, and when do they retire?

2 operable generators total 105 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s2105100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingSolar Photovoltaic752020n/a
2OperatingBatteries302021n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Echo River Solar plant?

EIA lists no joint owners for Echo River Solar. Florida Power & Light Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Florida Power & Light Co charge homes?

Florida Power & Light Co, the operator of Echo River Solar, had an average residential price of 14.62¢ per kWh and an average bill of $162 a month in 2025, 4% below the Florida average of 15.21¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Florida
Florida Power & Light Co14.62¢$1624% lower
Florida average15.21¢$168
U.S. average17.23¢$15113% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

What fuels does the Echo River Solar plant use?

Echo River Solar has capacity on 2 fuels: 71% solar and 29% battery and pumped storage. In 2025, solar made 101% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar7571.3%162,949
Battery and pumped storage3028.7%-1,776

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Echo River Solar plant?

Echo River Solar is in Live Oak, Suwannee County, Florida, at 30.2962° N, 82.8643° W. It sits in the Florida Power & Light Company balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Florida are similar in size?

Florida has 210 operable solar plants with 12,223 MW of capacity, and Echo River Solar's 74.5 MW is 1% of that.

Solar plants in Florida around this size
PlantCountyMW2025 MWh
Interstate Solar Energy CenterSt Lucie75135,110
Hibiscus Solar Energy CenterPalm Beach75148,834
Sweetbay Solar CenterMartin75130,793
Echo River SolarSuwannee75162,949
Okeechobee SolarOkeechobee75149,162
Southfork SolarManatee75144,690
Debary Solar Power PlantVolusia75126,812