Solar power plant, Florida

Sweetbay Solar Center, Florida

Sweetbay Solar Center is a 74.5 MW solar power plant in Martin County, Florida, operated by Florida Power & Light Co, and it generated 130,793 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 26th percentile of U.S. solar plants. By 2025 generation it ranks 3,099th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

74.5 MWNameplate capacity
20%Capacity factor, 2025, 26th percentile, on 74.5 MW net summer
3,099thU.S. rank by generation, 2025
5 yearsAverage generator age, by MW

How hard does the Sweetbay Solar Center plant run compared with other solar plants?

The Sweetbay Solar Center plant had a capacity factor of 20% in 2025 on 74.5 MW of net summer capacity, the 26th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 73 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Sweetbay Solar Center20%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Sweetbay Solar Center plant generating more or less than last year?

Generation at Sweetbay Solar Center rose 9.8% from 2024 to 2025, from 119,164 MWh to 130,793 MWh. Through August 2026 it is running 1.8% behind the same months of 2025.

Net generation by period
PeriodMWh
2024119,164
2025130,793
2026 through August87,697
2025, same months89,304
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202610,699
July 202610,894
June 202611,157
May 202612,389
April 202612,126
March 202612,144
February 20268,518
January 20269,770
December 202510,083
November 202510,165
October 202510,652
September 202510,589
August 202510,667
July 202510,853
June 202510,092
May 202511,881
April 202513,557
March 202513,146
February 202510,247
January 20258,861
December 20248,923
November 20248,486
October 20248,800
September 20249,838
August 20249,892
July 20249,916
June 20249,213
May 202412,295
April 202412,800
March 202411,079
February 202410,397
January 20247,525

Source: EIA Form EIA-923, through August 2026.

How much of Florida's electricity comes from the Sweetbay Solar Center plant?

Sweetbay Solar Center made 0.0% of the 267,867,735 MWh reported by Florida plants in 2025, from 0.1% of the state's 79,936 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 105th largest of 331 plants in Florida, the 3,163rd largest of 14,327 in the U.S. and the 642nd largest of 7,223 solar plants. By 2025 generation it is the 197th largest of 313 generating plants in the state.

Sweetbay Solar Center within Florida, 2025
MeasureThis plantFloridaShare
Capacity (MW)7579,9360.1%
Generation (MWh)130,793267,867,7350.0%
Solar capacity (MW)7512,2230.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Sweetbay Solar Center plant, and when do they retire?

1 operable generator totals 74.5 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s175100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingSolar Photovoltaic752020n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Sweetbay Solar Center plant?

EIA lists no joint owners for Sweetbay Solar Center. Florida Power & Light Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Florida Power & Light Co charge homes?

Florida Power & Light Co, the operator of Sweetbay Solar Center, had an average residential price of 14.62¢ per kWh and an average bill of $162 a month in 2025, 4% below the Florida average of 15.21¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Florida
Florida Power & Light Co14.62¢$1624% lower
Florida average15.21¢$168
U.S. average17.23¢$15113% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Sweetbay Solar Center plant?

Sweetbay Solar Center is in North of Indiantown, Martin County, Florida, at 27.0601° N, 80.4745° W. It sits in the Florida Power & Light Company balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Florida are similar in size?

Florida has 210 operable solar plants with 12,223 MW of capacity, and Sweetbay Solar Center's 74.5 MW is 1% of that.

Solar plants in Florida around this size
PlantCountyMW2025 MWh
Pioneer Trail Solar Energy CenterVolusia75128,710
Interstate Solar Energy CenterSt Lucie75135,110
Hibiscus Solar Energy CenterPalm Beach75148,834
Sweetbay Solar CenterMartin75130,793
Echo River SolarSuwannee75162,949
Okeechobee SolarOkeechobee75149,162
Southfork SolarManatee75144,690

Source: EIA Forms EIA-860 and EIA-923, 2025.