Solar power plant, Florida

Pioneer Trail Solar Energy Center, Florida

Pioneer Trail Solar Energy Center is a 74.5 MW solar power plant in Volusia County, Florida, operated by Florida Power & Light Co, and it generated 128,710 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 24th percentile of U.S. solar plants. By 2025 generation it ranks 3,113th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

74.5 MWNameplate capacity
20%Capacity factor, 2025, 24th percentile, on 74.5 MW net summer
3,113thU.S. rank by generation, 2025
6 yearsAverage generator age, by MW

How hard does the Pioneer Trail Solar Energy Center plant run compared with other solar plants?

The Pioneer Trail Solar Energy Center plant had a capacity factor of 20% in 2025 on 74.5 MW of net summer capacity, the 24th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 72 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Pioneer Trail Solar Energy Center20%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Pioneer Trail Solar Energy Center plant generating more or less than last year?

Generation at Pioneer Trail Solar Energy Center rose 15.9% from 2024 to 2025, from 111,051 MWh to 128,710 MWh. Through August 2026 it is running 2.7% behind the same months of 2025.

Net generation by period
PeriodMWh
2024111,051
2025128,710
2026 through August84,421
2025, same months86,762
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 20269,660
July 202611,245
June 202611,304
May 20269,026
April 202612,170
March 202611,862
February 20269,603
January 20269,551
December 20259,262
November 202511,234
October 202510,721
September 202510,731
August 202510,043
July 202510,066
June 202510,795
May 202511,959
April 202514,118
March 202512,993
February 20258,948
January 20257,840
December 20247,210
November 20247,741
October 20247,845
September 20247,774
August 20247,959
July 20248,771
June 20249,097
May 202410,976
April 202413,486
March 202411,342
February 202410,295
January 20248,555

Source: EIA Form EIA-923, through August 2026.

How much of Florida's electricity comes from the Pioneer Trail Solar Energy Center plant?

Pioneer Trail Solar Energy Center made 0.0% of the 267,867,735 MWh reported by Florida plants in 2025, from 0.1% of the state's 79,936 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 105th largest of 331 plants in Florida, the 3,163rd largest of 14,327 in the U.S. and the 639th largest of 7,223 solar plants. By 2025 generation it is the 201st largest of 313 generating plants in the state.

Pioneer Trail Solar Energy Center within Florida, 2025
MeasureThis plantFloridaShare
Capacity (MW)7579,9360.1%
Generation (MWh)128,710267,867,7350.0%
Solar capacity (MW)7512,2230.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Pioneer Trail Solar Energy Center plant, and when do they retire?

1 operable generator totals 74.5 MW, with an average age of 6 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s175100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingSolar Photovoltaic752019n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Pioneer Trail Solar Energy Center plant?

EIA lists no joint owners for Pioneer Trail Solar Energy Center. Florida Power & Light Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Florida Power & Light Co charge homes?

Florida Power & Light Co, the operator of Pioneer Trail Solar Energy Center, had an average residential price of 14.62¢ per kWh and an average bill of $162 a month in 2025, 4% below the Florida average of 15.21¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Florida
Florida Power & Light Co14.62¢$1624% lower
Florida average15.21¢$168
U.S. average17.23¢$15113% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Pioneer Trail Solar Energy Center plant?

Pioneer Trail Solar Energy Center is in New Smyrna Beach, Volusia County, Florida, at 29.0800° N, 81.1000° W. It sits in the Florida Power & Light Company balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Florida are similar in size?

Florida has 210 operable solar plants with 12,223 MW of capacity, and Pioneer Trail Solar Energy Center's 74.5 MW is 1% of that.

Solar plants in Florida around this size
PlantCountyMW2025 MWh
Lithia SolarHillsborough75142,364
Sunshine Gateway Solar Energy CenterColumbia75137,267
Miami Dade Solar Energy CenterMiami Dade75133,674
Pioneer Trail Solar Energy CenterVolusia75128,710
Interstate Solar Energy CenterSt Lucie75135,110
Hibiscus Solar Energy CenterPalm Beach75148,834
Sweetbay Solar CenterMartin75130,793

Source: EIA Forms EIA-860 and EIA-923, 2025.