Solar power plant, Florida

Interstate Solar Energy Center, Florida

Interstate Solar Energy Center is a 74.5 MW solar power plant in St Lucie County, Florida, operated by Florida Power & Light Co, and it generated 135,110 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Florida, and its capacity factor sits at the 30th percentile of U.S. solar plants. By 2025 generation it ranks 3,055th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

74.5 MWNameplate capacity
21%Capacity factor, 2025, 30th percentile, on 74.5 MW net summer
0.1%Of FL generation, 2025
6 yearsAverage generator age, by MW

How hard does the Interstate Solar Energy Center plant run compared with other solar plants?

The Interstate Solar Energy Center plant had a capacity factor of 21% in 2025 on 74.5 MW of net summer capacity, the 30th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 76 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Interstate Solar Energy Center21%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Interstate Solar Energy Center plant generating more or less than last year?

Generation at Interstate Solar Energy Center fell 0.7% from 2024 to 2025, from 136,118 MWh to 135,110 MWh. Through August 2026 it is running 0.6% behind the same months of 2025.

Net generation by period
PeriodMWh
2024136,118
2025135,110
2026 through August94,159
2025, same months94,699
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202612,513
July 202612,736
June 202612,661
May 202613,654
April 202612,697
March 202611,926
February 20269,242
January 20268,730
December 20259,805
November 20259,476
October 202510,784
September 202510,346
August 202512,395
July 202511,334
June 202511,240
May 202512,806
April 202514,297
March 202512,681
February 202510,515
January 20259,431
December 20249,860
November 20249,161
October 20249,633
September 20249,937
August 202411,893
July 202412,387
June 202410,850
May 202414,646
April 202414,774
March 202412,762
February 202411,993
January 20248,222

Source: EIA Form EIA-923, through August 2026.

How much of Florida's electricity comes from the Interstate Solar Energy Center plant?

Interstate Solar Energy Center made 0.1% of the 267,867,735 MWh reported by Florida plants in 2025, from 0.1% of the state's 79,936 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 105th largest of 331 plants in Florida, the 3,163rd largest of 14,327 in the U.S. and the 640th largest of 7,223 solar plants. By 2025 generation it is the 188th largest of 313 generating plants in the state.

Interstate Solar Energy Center within Florida, 2025
MeasureThis plantFloridaShare
Capacity (MW)7579,9360.1%
Generation (MWh)135,110267,867,7350.1%
Solar capacity (MW)7512,2230.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Interstate Solar Energy Center plant, and when do they retire?

1 operable generator totals 74.5 MW, with an average age of 6 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s175100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingSolar Photovoltaic752019n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Interstate Solar Energy Center plant?

EIA lists no joint owners for Interstate Solar Energy Center. Florida Power & Light Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Florida Power & Light Co charge homes?

Florida Power & Light Co, the operator of Interstate Solar Energy Center, had an average residential price of 14.62¢ per kWh and an average bill of $162 a month in 2025, 4% below the Florida average of 15.21¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Florida
Florida Power & Light Co14.62¢$1624% lower
Florida average15.21¢$168
U.S. average17.23¢$15113% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Interstate Solar Energy Center plant?

Interstate Solar Energy Center is in Ft. Pierce, St Lucie County, Florida, at 27.5000° N, 80.4400° W. It sits in the Florida Power & Light Company balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Florida are similar in size?

Florida has 210 operable solar plants with 12,223 MW of capacity, and Interstate Solar Energy Center's 74.5 MW is 1% of that.

Solar plants in Florida around this size
PlantCountyMW2025 MWh
Sunshine Gateway Solar Energy CenterColumbia75137,267
Miami Dade Solar Energy CenterMiami Dade75133,674
Pioneer Trail Solar Energy CenterVolusia75128,710
Interstate Solar Energy CenterSt Lucie75135,110
Hibiscus Solar Energy CenterPalm Beach75148,834
Sweetbay Solar CenterMartin75130,793
Echo River SolarSuwannee75162,949

Source: EIA Forms EIA-860 and EIA-923, 2025.