Skip to main content
RateWatt

Solar power plant, Florida

Hibiscus Solar Energy Center, Florida

Hibiscus Solar Energy Center is a 74.5 MW solar power plant in Palm Beach County, Florida, operated by Florida Power & Light Co, and it generated 148,834 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Florida, and its capacity factor sits at the 48th percentile of U.S. solar plants. By 2025 generation it ranks 2,917th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

74.5 MWNameplate capacity
23%Capacity factor, 2025, 48th percentile, on 74.5 MW net summer
0.1%Of FL generation, 2025
5 yearsAverage generator age, by MW

How hard does the Hibiscus Solar Energy Center plant run compared with other solar plants?

The Hibiscus Solar Energy Center plant had a capacity factor of 23% in 2025 on 74.5 MW of net summer capacity, the 48th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 83 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Hibiscus Solar Energy Center23%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Hibiscus Solar Energy Center plant generating more or less than last year?

Generation at Hibiscus Solar Energy Center rose 1.5% from 2024 to 2025, from 146,576 MWh to 148,834 MWh. Through August 2026 it is running 3.5% behind the same months of 2025.

Net generation by period
PeriodMWh
2024146,576
2025148,834
2026 through August100,098
2025, same months103,732
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202612,697
July 202613,363
June 202613,529
May 202614,581
April 202613,723
March 202613,317
February 202610,133
January 20268,755
December 202511,631
November 202511,157
October 202511,696
September 202510,618
August 202513,633
July 202513,170
June 202512,920
May 202514,676
April 202515,108
March 202513,387
February 202511,158
January 20259,680
December 202411,036
November 202411,029
October 202410,643
September 202412,209
August 202412,352
July 202413,648
June 202412,411
May 202416,466
April 202415,832
March 202410,542
February 202411,809
January 20248,599

Source: EIA Form EIA-923, through August 2026.

How much of Florida's electricity comes from the Hibiscus Solar Energy Center plant?

Hibiscus Solar Energy Center made 0.1% of the 267,867,735 MWh reported by Florida plants in 2025, from 0.1% of the state's 79,936 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 105th largest of 331 plants in Florida, the 3,163rd largest of 14,327 in the U.S. and the 641st largest of 7,223 solar plants. By 2025 generation it is the 158th largest of 313 generating plants in the state.

Hibiscus Solar Energy Center within Florida, 2025
MeasureThis plantFloridaShare
Capacity (MW)7579,9360.1%
Generation (MWh)148,834267,867,7350.1%
Solar capacity (MW)7512,2230.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Hibiscus Solar Energy Center plant, and when do they retire?

1 operable generator totals 74.5 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s175100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingSolar Photovoltaic752020n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Hibiscus Solar Energy Center plant?

EIA lists no joint owners for Hibiscus Solar Energy Center. Florida Power & Light Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Florida Power & Light Co charge homes?

Florida Power & Light Co, the operator of Hibiscus Solar Energy Center, had an average residential price of 14.62¢ per kWh and an average bill of $162 a month in 2025, 4% below the Florida average of 15.21¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Florida
Florida Power & Light Co14.62¢$1624% lower
Florida average15.21¢$168
U.S. average17.23¢$15113% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Hibiscus Solar Energy Center plant?

Hibiscus Solar Energy Center is in Westlake, Palm Beach County, Florida, at 26.7601° N, 80.3065° W. It sits in the Florida Power & Light Company balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Florida are similar in size?

Florida has 210 operable solar plants with 12,223 MW of capacity, and Hibiscus Solar Energy Center's 74.5 MW is 1% of that.

Solar plants in Florida around this size
PlantCountyMW2025 MWh
Miami Dade Solar Energy CenterMiami Dade75133,674
Pioneer Trail Solar Energy CenterVolusia75128,710
Interstate Solar Energy CenterSt Lucie75135,110
Hibiscus Solar Energy CenterPalm Beach75148,834
Sweetbay Solar CenterMartin75130,793
Echo River SolarSuwannee75162,949
Okeechobee SolarOkeechobee75149,162

Source: EIA Forms EIA-860 and EIA-923, 2025.