Skip to main content
RateWatt

Solar power plant, Florida

Southfork Solar power plant, Florida

Southfork Solar is a 74.5 MW solar power plant in Manatee County, Florida, operated by Florida Power & Light Co, and it generated 144,690 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Florida, and its capacity factor sits at the 42nd percentile of U.S. solar plants. By 2025 generation it ranks 2,955th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

74.5 MWNameplate capacity
22%Capacity factor, 2025, 42nd percentile, on 74.5 MW net summer
0.1%Of FL generation, 2025
5 yearsAverage generator age, by MW

How hard does the Southfork Solar plant run compared with other solar plants?

The Southfork Solar plant had a capacity factor of 22% in 2025 on 74.5 MW of net summer capacity, the 42nd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 81 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Southfork Solar22%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Southfork Solar plant generating more or less than last year?

Generation at Southfork Solar fell 10.5% from 2024 to 2025, from 161,670 MWh to 144,690 MWh. Through August 2026 it is running 32.7% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024161,670
2025144,690
2026 through August122,716
2025, same months92,444
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202614,973
July 202615,028
June 202616,426
May 202617,682
April 202618,086
March 202615,660
February 202613,405
January 202611,456
December 202511,019
November 202512,709
October 202514,886
September 202513,632
August 202512,625
July 202513,860
June 202512,897
May 202513,745
April 202514,363
March 202510,683
February 20257,682
January 20256,589
December 20246,838
November 20246,981
October 20249,175
September 202413,907
August 202415,503
July 202416,113
June 202416,665
May 202419,235
April 202419,270
March 202415,314
February 202414,414
January 20248,255

Source: EIA Form EIA-923, through August 2026.

How much of Florida's electricity comes from the Southfork Solar plant?

Southfork Solar made 0.1% of the 267,867,735 MWh reported by Florida plants in 2025, from 0.1% of the state's 79,936 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 105th largest of 331 plants in Florida, the 3,163rd largest of 14,327 in the U.S. and the 645th largest of 7,223 solar plants. By 2025 generation it is the 168th largest of 313 generating plants in the state.

Southfork Solar within Florida, 2025
MeasureThis plantFloridaShare
Capacity (MW)7579,9360.1%
Generation (MWh)144,690267,867,7350.1%
Solar capacity (MW)7512,2230.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Southfork Solar plant, and when do they retire?

1 operable generator totals 74.5 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s175100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingSolar Photovoltaic752020n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Southfork Solar plant?

EIA lists no joint owners for Southfork Solar. Florida Power & Light Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Florida Power & Light Co charge homes?

Florida Power & Light Co, the operator of Southfork Solar, had an average residential price of 14.62¢ per kWh and an average bill of $162 a month in 2025, 4% below the Florida average of 15.21¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Florida
Florida Power & Light Co14.62¢$1624% lower
Florida average15.21¢$168
U.S. average17.23¢$15113% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Southfork Solar plant?

Southfork Solar is in Parrish, Manatee County, Florida, at 27.5732° N, 82.1914° W. It sits in the Florida Power & Light Company balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Florida are similar in size?

Florida has 210 operable solar plants with 12,223 MW of capacity, and Southfork Solar's 74.5 MW is 1% of that.

Solar plants in Florida around this size
PlantCountyMW2025 MWh
Sweetbay Solar CenterMartin75130,793
Echo River SolarSuwannee75162,949
Okeechobee SolarOkeechobee75149,162
Southfork SolarManatee75144,690
Debary Solar Power PlantVolusia75126,812
Blue Heron SolarHendry75154,302
Cattle RanchDeSoto75146,676

Source: EIA Forms EIA-860 and EIA-923, 2025.