Wind power plant, Iowa

Diamond Trail Wind Farm, Iowa

Diamond Trail Wind Farm is a 253 MW wind power plant in Iowa County, Iowa, operated by MidAmerican Energy Co, and it generated 862,903 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.2% of the generation reported in Iowa, and its capacity factor sits at the 71st percentile of U.S. wind plants. By 2025 generation it ranks 822nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

253 MWNameplate capacity
39%Capacity factor, 2025, 71st percentile, on 250 MW net summer
1.2%Of IA generation, 2025
5 yearsAverage generator age, by MW

How hard does the Diamond Trail Wind Farm plant run compared with other wind plants?

The Diamond Trail Wind Farm plant had a capacity factor of 39% in 2025 on 250 MW of net summer capacity, the 71st percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 144 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Diamond Trail Wind Farm39%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Diamond Trail Wind Farm plant generating more or less than last year?

Generation at Diamond Trail Wind Farm rose 2.3% from 2024 to 2025, from 843,401 MWh to 862,903 MWh. Through August 2026 it is running 3.6% behind the same months of 2025.

Net generation by period
PeriodMWh
2024843,401
2025862,903
2026 through August540,721
2025, same months561,085
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202635,415
July 202621,660
June 202653,495
May 202666,091
April 2026103,715
March 202694,818
February 202678,673
January 202686,854
December 202592,371
November 202585,488
October 202584,018
September 202539,941
August 202535,117
July 202533,536
June 202554,051
May 202560,361
April 202592,830
March 2025107,753
February 202584,185
January 202593,252
December 202474,201
November 202481,367
October 202479,463
September 202451,439
August 202441,952
July 202432,161
June 202464,466
May 202459,969
April 2024104,389
March 2024100,383
February 202484,920
January 202468,691

Source: EIA Form EIA-923, through August 2026.

How much of Iowa's electricity comes from the Diamond Trail Wind Farm plant?

Diamond Trail Wind Farm made 1.2% of the 74,502,373 MWh reported by Iowa plants in 2025, from 1.0% of the state's 24,817 MW of capacity. By capacity it is the 26th largest of 306 plants in Iowa, the 1,226th largest of 14,327 in the U.S. and the 133rd largest of 1,358 wind plants. By 2025 generation it is the 21st largest of 283 generating plants in the state.

Diamond Trail Wind Farm within Iowa, 2025
MeasureThis plantIowaShare
Capacity (MW)25324,8171.0%
Generation (MWh)862,90374,502,3731.2%
Wind capacity (MW)25313,4101.9%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Diamond Trail Wind Farm plant, and when do they retire?

1 operable generator totals 253 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1253100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
DTWFOperatingOnshore Wind Turbine2532020n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Diamond Trail Wind Farm plant?

EIA lists no joint owners for Diamond Trail Wind Farm. MidAmerican Energy Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does MidAmerican Energy Co charge homes?

MidAmerican Energy Co, the operator of Diamond Trail Wind Farm, had an average residential price of 11.21¢ per kWh and an average bill of $93 a month in 2025, 18% below the Iowa average of 13.62¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Iowa
MidAmerican Energy Co11.21¢$9318% lower
Iowa average13.62¢$117
U.S. average17.23¢$15126% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Diamond Trail Wind Farm plant?

Diamond Trail Wind Farm is in Ladora, Iowa County, Iowa, at 41.6744° N, 92.1642° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region MRO).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Iowa are similar in size?

Iowa has 123 operable wind plants with 13,410 MW of capacity, and Diamond Trail Wind Farm's 253 MW is 2% of that.

Wind plants in Iowa around this size
PlantCountyMW2025 MWh
Pomeroy Wind FarmPocahontas2861,003,340
Lundgren Wind ProjectWebster271604,859
Southern Hills Wind FarmUnion254814,400
Diamond Trail Wind FarmIowa253862,903
O'Brien WindO'Brien250851,159
Great Pathfinder WindHamilton224809,711
Shenandoah Hills Wind FarmPage21426,748

Source: EIA Forms EIA-860 and EIA-923, 2025.