Wind power plant, Iowa

O'Brien Wind power plant, Iowa

O'Brien Wind is a 250 MW wind power plant in O'Brien County, Iowa, operated by MidAmerican Energy Co, and it generated 851,159 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.1% of the generation reported in Iowa, and its capacity factor sits at the 69th percentile of U.S. wind plants. By 2025 generation it ranks 835th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

250 MWNameplate capacity
39%Capacity factor, 2025, 69th percentile, on 250 MW net summer
1.1%Of IA generation, 2025
9 yearsAverage generator age, by MW

How hard does the O'Brien Wind plant run compared with other wind plants?

The O'Brien Wind plant had a capacity factor of 39% in 2025 on 250 MW of net summer capacity, the 69th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 142 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
O'Brien Wind39%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the O'Brien Wind plant generating more or less than last year?

Generation at O'Brien Wind fell 2.8% from 2024 to 2025, from 875,933 MWh to 851,159 MWh.

Net generation by period
PeriodMWh
2024875,933
2025851,159
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202587,466
November 202578,585
October 202581,042
September 202537,454
August 202530,072
July 202536,400
June 202555,086
May 202563,006
April 2025100,013
March 2025101,326
February 202585,187
January 202595,522
December 202468,728
November 202474,235
October 202491,344
September 202457,292
August 202440,977
July 202434,616
June 202467,254
May 202476,382
April 2024113,339
March 2024104,087
February 202480,885
January 202466,794

Source: EIA Form EIA-923, through August 2026.

How much of Iowa's electricity comes from the O'Brien Wind plant?

O'Brien Wind made 1.1% of the 74,502,373 MWh reported by Iowa plants in 2025, from 1.0% of the state's 24,817 MW of capacity. By capacity it is the 27th largest of 306 plants in Iowa, the 1,237th largest of 14,327 in the U.S. and the 137th largest of 1,358 wind plants. By 2025 generation it is the 23rd largest of 283 generating plants in the state.

O'Brien Wind within Iowa, 2025
MeasureThis plantIowaShare
Capacity (MW)25024,8171.0%
Generation (MWh)851,15974,502,3731.1%
Wind capacity (MW)25013,4101.9%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the O'Brien Wind plant, and when do they retire?

3 operable generators total 250 MW, with an average age of 9 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s3250100%none reported
Every generator, 6 in all
UnitStatusTechnologyMWIn servicePlanned retirement
OBWFOperatingOnshore Wind Turbine622016n/a
OBWF2OperatingOnshore Wind Turbine1092016n/a
OBWF3OperatingOnshore Wind Turbine802016n/a
OBWF4CancelledOnshore Wind Turbine73n/an/a
OBWF5CancelledOnshore Wind Turbine73n/an/a
OBWF6CancelledOnshore Wind Turbine73n/an/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the O'Brien Wind plant?

EIA lists no joint owners for O'Brien Wind. MidAmerican Energy Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does MidAmerican Energy Co charge homes?

MidAmerican Energy Co, the operator of O'Brien Wind, had an average residential price of 11.21¢ per kWh and an average bill of $93 a month in 2025, 18% below the Iowa average of 13.62¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Iowa
MidAmerican Energy Co11.21¢$9318% lower
Iowa average13.62¢$117
U.S. average17.23¢$15126% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the O'Brien Wind plant?

O'Brien Wind is in Primghar, O'Brien County, Iowa, at 43.2004° N, 95.6243° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region MRO).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Iowa are similar in size?

Iowa has 123 operable wind plants with 13,410 MW of capacity, and O'Brien Wind's 250 MW is 2% of that.

Wind plants in Iowa around this size
PlantCountyMW2025 MWh
Lundgren Wind ProjectWebster271604,859
Southern Hills Wind FarmUnion254814,400
Diamond Trail Wind FarmIowa253862,903
O'Brien WindO'Brien250851,159
Great Pathfinder WindHamilton224809,711
Shenandoah Hills Wind FarmPage21426,748
Glaciers Edge Wind ProjectCherokee212828,381

Source: EIA Forms EIA-860 and EIA-923, 2025.