Glaciers Edge Wind Project, Iowa

Glaciers Edge Wind Project is a 212 MW wind power plant in Cherokee County, Iowa, operated by EDF Renewable Asset Holdings, Inc., and it generated 828,381 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.1% of the generation reported in Iowa, and its capacity factor sits at the 96th percentile of U.S. wind plants. By 2025 generation it ranks 847th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

212 MWNameplate capacity
47%Capacity factor, 2025, 96th percentile, on 200 MW net summer
1.1%Of IA generation, 2025
6 yearsAverage generator age, by MW

How hard does the Glaciers Edge Wind Project plant run compared with other wind plants?

The Glaciers Edge Wind Project plant had a capacity factor of 47% in 2025 on 200 MW of net summer capacity, the 96th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 173 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Glaciers Edge Wind Project47%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Glaciers Edge Wind Project plant generating more or less than last year?

Generation at Glaciers Edge Wind Project fell 4.2% from 2024 to 2025, from 865,127 MWh to 828,381 MWh. Through August 2026 it is running 1.7% behind the same months of 2025.

Net generation by period
PeriodMWh
2024865,127
2025828,381
2026 through August535,503
2025, same months544,706
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202642,272
July 202637,119
June 202656,854
May 202672,888
April 202691,379
March 202688,938
February 202673,557
January 202672,496
December 202580,520
November 202572,700
October 202583,675
September 202546,780
August 202538,372
July 202541,539
June 202554,062
May 202563,182
April 202587,658
March 202590,232
February 202577,062
January 202592,599
December 202472,592
November 202475,535
October 202492,093
September 202465,285
August 202445,163
July 202435,624
June 202460,666
May 202472,672
April 2024102,879
March 202497,913
February 202478,980
January 202465,725

Source: EIA Form EIA-923, through August 2026.

How much of Iowa's electricity comes from the Glaciers Edge Wind Project plant?

Glaciers Edge Wind Project made 1.1% of the 74,502,373 MWh reported by Iowa plants in 2025, from 0.9% of the state's 24,817 MW of capacity. Its share of output is 1.3 times its share of capacity. By capacity it is the 30th largest of 306 plants in Iowa, the 1,428th largest of 14,327 in the U.S. and the 206th largest of 1,358 wind plants. By 2025 generation it is the 25th largest of 283 generating plants in the state.

Glaciers Edge Wind Project within Iowa, 2025
MeasureThis plantIowaShare
Capacity (MW)21224,8170.9%
Generation (MWh)828,38174,502,3731.1%
Wind capacity (MW)21213,4101.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Glaciers Edge Wind Project plant, and when do they retire?

1 operable generator totals 212 MW, with an average age of 6 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s1212100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GEWOperatingOnshore Wind Turbine2122019n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Glaciers Edge Wind Project plant?

EIA lists no joint owners for Glaciers Edge Wind Project. EDF Renewable Asset Holdings, Inc. operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Glaciers Edge Wind Project plant?

Glaciers Edge Wind Project is in Cleghorn, Cherokee County, Iowa, at 42.8620° N, 95.7720° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region MRO).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Iowa are similar in size?

Iowa has 123 operable wind plants with 13,410 MW of capacity, and Glaciers Edge Wind Project's 212 MW is 2% of that.

Wind plants in Iowa around this size
PlantCountyMW2025 MWh
O'Brien WindO'Brien250851,159
Great Pathfinder WindHamilton224809,711
Shenandoah Hills Wind FarmPage21426,748
Glaciers Edge Wind ProjectCherokee212828,381
Eclipse Wind FarmGuthrie207831,978
Ledyard Windpower, LLCKossuth207595,925
Plymouth WindPlymouth203799,637

Source: EIA Forms EIA-860 and EIA-923, 2025.