Wind power plant, Iowa
Ledyard Windpower, LLC wind power plant, Iowa
Ledyard Windpower, LLC is a 207 MW wind power plant in Kossuth County, Iowa, operated by Deriva Energy, and it generated 595,925 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.8% of the generation reported in Iowa, and its capacity factor sits at the 54th percentile of U.S. wind plants. By 2025 generation it ranks 1,131st of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Ledyard Windpower, LLC plant run compared with other wind plants?
The Ledyard Windpower, LLC plant had a capacity factor of 34% in 2025 on 200 MW of net summer capacity, the 54th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 124 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Ledyard Windpower, LLC | 34% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Ledyard Windpower, LLC plant generating more or less than last year?
Generation at Ledyard Windpower, LLC fell 24.6% from 2024 to 2025, from 790,739 MWh to 595,925 MWh. Through August 2026 it is running 17.8% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 790,739 |
| 2025 | 595,925 |
| 2026 through August | 501,659 |
| 2025, same months | 425,768 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 53,325 |
| July 2026 | 38,438 |
| June 2026 | 65,157 |
| May 2026 | 37,968 |
| April 2026 | 79,558 |
| March 2026 | 65,310 |
| February 2026 | 80,900 |
| January 2026 | 81,003 |
| December 2025 | 52,159 |
| November 2025 | 64,584 |
| October 2025 | 21,443 |
| September 2025 | 31,971 |
| August 2025 | 30,335 |
| July 2025 | 36,193 |
| June 2025 | 21,158 |
| May 2025 | 63,238 |
| April 2025 | 60,803 |
| March 2025 | 93,032 |
| February 2025 | 74,313 |
| January 2025 | 46,696 |
| December 2024 | 61,481 |
| November 2024 | 63,696 |
| October 2024 | 85,328 |
| September 2024 | 61,723 |
| August 2024 | 46,182 |
| July 2024 | 38,458 |
| June 2024 | 52,518 |
| May 2024 | 71,743 |
| April 2024 | 92,167 |
| March 2024 | 87,352 |
| February 2024 | 74,443 |
| January 2024 | 55,648 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Ledyard Windpower, LLC plant, and when do they retire?
1 operable generator totals 207 MW, with an average age of 3 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 207 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| LDYRD | Operating | Onshore Wind Turbine | 207 | 2022 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Ledyard Windpower, LLC plant?
Ledyard Windpower, LLC is the only joint owner reported for Ledyard Windpower, LLC, with 100.0%. Deriva Energy operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Ledyard Windpower, LLC plant?
Ledyard Windpower, LLC is in Lakota, Kossuth County, Iowa, at 43.4301° N, 94.1070° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region MRO).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Iowa are similar in size?
Iowa has 123 operable wind plants with 13,410 MW of capacity, and Ledyard Windpower, LLC's 207 MW is 2% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Shenandoah Hills Wind Farm | Page | 214 | 26,748 |
| Glaciers Edge Wind Project | Cherokee | 212 | 828,381 |
| Eclipse Wind Farm | Guthrie | 207 | 831,978 |
| Ledyard Windpower, LLC | Kossuth | 207 | 595,925 |
| Plymouth Wind | Plymouth | 203 | 799,637 |
| Chickasaw Wind Farm | Chickasaw | 202 | 645,362 |
| Whispering Willow North | Franklin | 201 | 733,862 |
Source: EIA Forms EIA-860 and EIA-923, 2025.