Wind power plant, Iowa
Shenandoah Hills Wind Farm, Iowa
Shenandoah Hills Wind Farm is a 214 MW wind power plant in Page County, Iowa, operated by MidAmerican Energy Co, and it generated 26,748 MWh in 2025 (Forms EIA-860 and EIA-923). By 2025 generation it ranks 4,883rd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Shenandoah Hills Wind Farm plant run compared with other wind plants?
The Shenandoah Hills Wind Farm plant had a capacity factor of 1% in 2025 on 214 MW of net summer capacity, below nearly all of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 5 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Shenandoah Hills Wind Farm | 1% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Shenandoah Hills Wind Farm plant generating more or less than last year?
Shenandoah Hills Wind Farm generated 26,748 MWh in 2025; EIA reports no 2024 total to compare.
| Period | MWh |
|---|---|
| 2024 | n/a |
| 2025 | 26,748 |
| 2026 through August | 417,472 |
Monthly generation, Nov 2025 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 39,390 |
| July 2026 | 28,364 |
| June 2026 | 40,666 |
| May 2026 | 53,801 |
| April 2026 | 85,141 |
| March 2026 | 80,065 |
| February 2026 | 49,196 |
| January 2026 | 40,849 |
| December 2025 | 22,834 |
| November 2025 | 3,914 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Shenandoah Hills Wind Farm plant, and when do they retire?
1 operable generator totals 214 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 214 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| SHWF | Operating | Onshore Wind Turbine | 214 | 2025 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Shenandoah Hills Wind Farm plant?
EIA lists no joint owners for Shenandoah Hills Wind Farm. MidAmerican Energy Co operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What does MidAmerican Energy Co charge homes?
MidAmerican Energy Co, the operator of Shenandoah Hills Wind Farm, had an average residential price of 11.21¢ per kWh and an average bill of $93 a month in 2025, 18% below the Iowa average of 13.62¢.
| Measure | Price | Monthly bill | Against Iowa |
|---|---|---|---|
| MidAmerican Energy Co | 11.21¢ | $93 | 18% lower |
| Iowa average | 13.62¢ | $117 | |
| U.S. average | 17.23¢ | $151 | 26% higher |
Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.
Where is the Shenandoah Hills Wind Farm plant?
Shenandoah Hills Wind Farm is in Blanchard, Page County, Iowa, at 40.6341° N, 95.3707° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region MRO).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Iowa are similar in size?
Iowa has 123 operable wind plants with 13,410 MW of capacity, and Shenandoah Hills Wind Farm's 214 MW is 2% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Diamond Trail Wind Farm | Iowa | 253 | 862,903 |
| O'Brien Wind | O'Brien | 250 | 851,159 |
| Great Pathfinder Wind | Hamilton | 224 | 809,711 |
| Shenandoah Hills Wind Farm | Page | 214 | 26,748 |
| Glaciers Edge Wind Project | Cherokee | 212 | 828,381 |
| Eclipse Wind Farm | Guthrie | 207 | 831,978 |
| Ledyard Windpower, LLC | Kossuth | 207 | 595,925 |
Source: EIA Forms EIA-860 and EIA-923, 2025.