Natural gas power plant, California
El Centro Hybrid natural gas power plant, California
El Centro Hybrid is a 388 MW power plant, 358 MW of it natural gas, in Imperial County, California, operated by Imperial Irrigation District, and it generated 1,089,743 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.5% of the generation reported in California, and its capacity factor sits at the 66th percentile of U.S. natural gas plants. By 2025 generation it ranks 700th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the El Centro Hybrid plant run compared with other natural gas plants?
The El Centro Hybrid plant's natural gas units had a capacity factor of 43% in 2025 on 293 MW of net summer capacity, the 66th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 155 days at full output out of 365.
0%Shaded: the middle half of natural gas plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| El Centro Hybrid | 43% |
| Natural gas plants, 75th percentile | 56% |
| Natural gas plants, median | 22% |
| Natural gas plants, 25th percentile | 6% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its natural gas generators only. Values above 105% are left out of the comparison.
Is the El Centro Hybrid plant generating more or less than last year?
Generation at El Centro Hybrid rose 4.9% from 2024 to 2025, from 1,038,712 MWh to 1,089,743 MWh. Through August 2026 it is running 28.4% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 1,038,712 |
| 2025 | 1,089,743 |
| 2026 through August | 553,056 |
| 2025, same months | 772,464 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 133,645 |
| July 2026 | 115,554 |
| June 2026 | 111,845 |
| May 2026 | 78,310 |
| April 2026 | 32,144 |
| March 2026 | 23,413 |
| February 2026 | 9,466 |
| January 2026 | 48,679 |
| December 2025 | 58,343 |
| November 2025 | 67,400 |
| October 2025 | 75,513 |
| September 2025 | 116,023 |
| August 2025 | 147,219 |
| July 2025 | 145,033 |
| June 2025 | 125,740 |
| May 2025 | 101,172 |
| April 2025 | 59,671 |
| March 2025 | 62,594 |
| February 2025 | 56,968 |
| January 2025 | 74,067 |
| December 2024 | 69,139 |
| November 2024 | 68,138 |
| October 2024 | 93,793 |
| September 2024 | 121,060 |
| August 2024 | 138,309 |
| July 2024 | 150,586 |
| June 2024 | 124,176 |
| May 2024 | 40,547 |
| April 2024 | 35,846 |
| March 2024 | 67,815 |
| February 2024 | 63,111 |
| January 2024 | 66,192 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the El Centro Hybrid plant, and when do they retire?
7 operable generators total 388 MW, with an average age of 32 years weighted by capacity at the end of 2025. 81.6 MW, 21% of operable capacity, has a planned retirement, the first in 2029. 6 more are proposed, totalling 113 MW. 1 has already retired, totalling 50 MW.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 1950s | 1 | 35 | 9% | none reported |
| 1960s | 1 | 82 | 21% | 2029 |
| 1990s | 1 | 90 | 23% | none reported |
| 2010s | 4 | 182 | 47% | none reported |
| Year | Units | MW retiring | Share of plant |
|---|---|---|---|
| 2029 | 1 | 82 | 21% |
Every generator, 14 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 2 | Operating | Natural Gas Fired Combined Cycle | 35 | 1952 | n/a |
| 4 | Operating | Natural Gas Steam Turbine | 82 | 1968 | 2029 |
| 2A | Operating | Natural Gas Fired Combined Cycle | 90 | 1993 | n/a |
| 30 | Operating | Natural Gas Fired Combined Cycle | 66 | 2012 | n/a |
| 31 | Operating | Natural Gas Fired Combined Cycle | 43 | 2012 | n/a |
| 32 | Operating | Natural Gas Fired Combined Cycle | 43 | 2012 | n/a |
| BESS | Operating | Batteries | 30 | 2016 | n/a |
| RICE1 | Planned, not yet approved | Natural Gas Internal Combustion Engine | 19 | 2029 | n/a |
| RICE2 | Planned, not yet approved | Natural Gas Internal Combustion Engine | 19 | 2029 | n/a |
| RICE3 | Planned, not yet approved | Natural Gas Internal Combustion Engine | 19 | 2029 | n/a |
| RICE4 | Planned, not yet approved | Natural Gas Internal Combustion Engine | 19 | 2029 | n/a |
| RICE5 | Planned, not yet approved | Natural Gas Internal Combustion Engine | 19 | 2029 | n/a |
| RICE6 | Planned, not yet approved | Natural Gas Internal Combustion Engine | 19 | 2029 | n/a |
| 3 | Retired | Natural Gas Steam Turbine | 50 | 1957 | 2010 |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the El Centro Hybrid plant?
EIA lists no joint owners for El Centro Hybrid. Imperial Irrigation District operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What does Imperial Irrigation District charge homes?
Imperial Irrigation District, the operator of El Centro Hybrid, had an average residential price of 18.68¢ per kWh and an average bill of $202 a month in 2025, 40% below the California average of 31.35¢.
| Measure | Price | Monthly bill | Against California |
|---|---|---|---|
| Imperial Irrigation District | 18.68¢ | $202 | 40% lower |
| California average | 31.35¢ | $155 | |
| U.S. average | 17.23¢ | $151 | 45% lower |
Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.
What fuels does the El Centro Hybrid plant use?
El Centro Hybrid has capacity on 2 fuels: 92% natural gas and 8% battery and pumped storage. In 2025, natural gas made 100% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Natural gas | 358 | 92.3% | 1,093,177 |
| Battery and pumped storage | 30 | 7.7% | -3,434 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is the El Centro Hybrid plant?
El Centro Hybrid is in El Centro, Imperial County, California, at 32.8022° N, 115.5400° W. It sits in the Imperial Irrigation District balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which natural gas plants in California are similar in size?
California has 304 operable natural gas plants with 40,211 MW of capacity, and El Centro Hybrid's 358 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Watson Cogeneration | Los Angeles | 405 | 1,783,717 |
| Pio Pico Energy Center | San Diego | 395 | 46,864 |
| Magnolia Power Project | Los Angeles | 388 | 1,204,502 |
| El Centro Hybrid | Imperial | 358 | 1,093,177 |
| Tracy Combined Cycle Power Plant | San Joaquin | 336 | 896,191 |
| Los Esteros Critical Energy Center | Santa Clara | 306 | 156,503 |
| Walnut Energy Center | Stanislaus | 301 | 1,604,800 |
Source: EIA Forms EIA-860 and EIA-923, 2025.