Natural gas power plant, California

El Centro Hybrid natural gas power plant, California

El Centro Hybrid is a 388 MW power plant, 358 MW of it natural gas, in Imperial County, California, operated by Imperial Irrigation District, and it generated 1,089,743 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.5% of the generation reported in California, and its capacity factor sits at the 66th percentile of U.S. natural gas plants. By 2025 generation it ranks 700th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

388 MWNameplate capacity
43%Capacity factor, 2025, natural gas units, 66th percentile, on 293 MW net summer
0.5%Of CA generation, 2025
32 yearsAverage generator age, by MW

How hard does the El Centro Hybrid plant run compared with other natural gas plants?

The El Centro Hybrid plant's natural gas units had a capacity factor of 43% in 2025 on 293 MW of net summer capacity, the 66th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 155 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
El Centro Hybrid43%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its natural gas generators only. Values above 105% are left out of the comparison.

Is the El Centro Hybrid plant generating more or less than last year?

Generation at El Centro Hybrid rose 4.9% from 2024 to 2025, from 1,038,712 MWh to 1,089,743 MWh. Through August 2026 it is running 28.4% behind the same months of 2025.

Net generation by period
PeriodMWh
20241,038,712
20251,089,743
2026 through August553,056
2025, same months772,464
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 2026133,645
July 2026115,554
June 2026111,845
May 202678,310
April 202632,144
March 202623,413
February 20269,466
January 202648,679
December 202558,343
November 202567,400
October 202575,513
September 2025116,023
August 2025147,219
July 2025145,033
June 2025125,740
May 2025101,172
April 202559,671
March 202562,594
February 202556,968
January 202574,067
December 202469,139
November 202468,138
October 202493,793
September 2024121,060
August 2024138,309
July 2024150,586
June 2024124,176
May 202440,547
April 202435,846
March 202467,815
February 202463,111
January 202466,192

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the El Centro Hybrid plant?

El Centro Hybrid made 0.5% of the 204,542,898 MWh reported by California plants in 2025, from 0.4% of the state's 107,433 MW of capacity. Its share of output is 1.5 times its share of capacity. By capacity it is the 55th largest of 1,877 plants in California, the 866th largest of 14,327 in the U.S. and the 549th largest of 1,962 natural gas plants on its natural gas units alone. By 2025 generation it is the 32nd largest of 1,608 generating plants in the state.

El Centro Hybrid within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)388107,4330.4%
Generation (MWh)1,089,743204,542,8980.5%
Natural gas capacity (MW)35840,2110.9%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the El Centro Hybrid plant, and when do they retire?

7 operable generators total 388 MW, with an average age of 32 years weighted by capacity at the end of 2025. 81.6 MW, 21% of operable capacity, has a planned retirement, the first in 2029. 6 more are proposed, totalling 113 MW. 1 has already retired, totalling 50 MW.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1950s1359%none reported
1960s18221%2029
1990s19023%none reported
2010s418247%none reported
Capacity retiring by year
YearUnitsMW retiringShare of plant
202918221%
Every generator, 14 in all
UnitStatusTechnologyMWIn servicePlanned retirement
2OperatingNatural Gas Fired Combined Cycle351952n/a
4OperatingNatural Gas Steam Turbine8219682029
2AOperatingNatural Gas Fired Combined Cycle901993n/a
30OperatingNatural Gas Fired Combined Cycle662012n/a
31OperatingNatural Gas Fired Combined Cycle432012n/a
32OperatingNatural Gas Fired Combined Cycle432012n/a
BESSOperatingBatteries302016n/a
RICE1Planned, not yet approvedNatural Gas Internal Combustion Engine192029n/a
RICE2Planned, not yet approvedNatural Gas Internal Combustion Engine192029n/a
RICE3Planned, not yet approvedNatural Gas Internal Combustion Engine192029n/a
RICE4Planned, not yet approvedNatural Gas Internal Combustion Engine192029n/a
RICE5Planned, not yet approvedNatural Gas Internal Combustion Engine192029n/a
RICE6Planned, not yet approvedNatural Gas Internal Combustion Engine192029n/a
3RetiredNatural Gas Steam Turbine5019572010

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the El Centro Hybrid plant?

EIA lists no joint owners for El Centro Hybrid. Imperial Irrigation District operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Imperial Irrigation District charge homes?

Imperial Irrigation District, the operator of El Centro Hybrid, had an average residential price of 18.68¢ per kWh and an average bill of $202 a month in 2025, 40% below the California average of 31.35¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst California
Imperial Irrigation District18.68¢$20240% lower
California average31.35¢$155
U.S. average17.23¢$15145% lower

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

What fuels does the El Centro Hybrid plant use?

El Centro Hybrid has capacity on 2 fuels: 92% natural gas and 8% battery and pumped storage. In 2025, natural gas made 100% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Natural gas35892.3%1,093,177
Battery and pumped storage307.7%-3,434

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the El Centro Hybrid plant?

El Centro Hybrid is in El Centro, Imperial County, California, at 32.8022° N, 115.5400° W. It sits in the Imperial Irrigation District balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in California are similar in size?

California has 304 operable natural gas plants with 40,211 MW of capacity, and El Centro Hybrid's 358 MW is 1% of that.

Natural gas plants in California around this size
PlantCountyMW2025 MWh
Watson CogenerationLos Angeles4051,783,717
Pio Pico Energy CenterSan Diego39546,864
Magnolia Power ProjectLos Angeles3881,204,502
El Centro HybridImperial3581,093,177
Tracy Combined Cycle Power PlantSan Joaquin336896,191
Los Esteros Critical Energy CenterSanta Clara306156,503
Walnut Energy CenterStanislaus3011,604,800

Source: EIA Forms EIA-860 and EIA-923, 2025.