Natural gas power plant, California
Magnolia Power Project, California
Magnolia Power Project is a 388 MW natural gas power plant in Los Angeles County, California, operated by City of Burbank Water and Power-(CA), and it generated 1,204,502 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.6% of the generation reported in California, and its capacity factor sits at the 68th percentile of U.S. natural gas plants. By 2025 generation it ranks 662nd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Magnolia Power Project plant run compared with other natural gas plants?
The Magnolia Power Project plant had a capacity factor of 46% in 2025 on 301 MW of net summer capacity, the 68th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 167 days at full output out of 365.
0%Shaded: the middle half of natural gas plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Magnolia Power Project | 46% |
| Natural gas plants, 75th percentile | 56% |
| Natural gas plants, median | 22% |
| Natural gas plants, 25th percentile | 6% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Magnolia Power Project plant generating more or less than last year?
Generation at Magnolia Power Project fell 22.4% from 2024 to 2025, from 1,553,013 MWh to 1,204,502 MWh. Through August 2026 it is running 1.2% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 1,553,013 |
| 2025 | 1,204,502 |
| 2026 through August | 736,715 |
| 2025, same months | 728,333 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 152,192 |
| July 2026 | 126,109 |
| June 2026 | 83,628 |
| May 2026 | 78,614 |
| April 2026 | 89,382 |
| March 2026 | 94,300 |
| February 2026 | 38,048 |
| January 2026 | 74,442 |
| December 2025 | 121,546 |
| November 2025 | 120,558 |
| October 2025 | 106,859 |
| September 2025 | 127,206 |
| August 2025 | 130,474 |
| July 2025 | 115,207 |
| June 2025 | 97,605 |
| May 2025 | 115,543 |
| April 2025 | 17,302 |
| March 2025 | 0 |
| February 2025 | 111,235 |
| January 2025 | 140,967 |
| December 2024 | 102,172 |
| November 2024 | 137,297 |
| October 2024 | 142,679 |
| September 2024 | 120,542 |
| August 2024 | 153,093 |
| July 2024 | 157,213 |
| June 2024 | 113,865 |
| May 2024 | 114,632 |
| April 2024 | 116,750 |
| March 2024 | 103,603 |
| February 2024 | 134,338 |
| January 2024 | 156,829 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Magnolia Power Project plant, and when do they retire?
2 operable generators total 388 MW, with an average age of 20 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2000s | 2 | 388 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 1 | Operating | Natural Gas Fired Combined Cycle | 199 | 2005 | n/a |
| 2 | Operating | Natural Gas Fired Combined Cycle | 189 | 2005 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Magnolia Power Project plant?
Southern California P P A is the only joint owner reported for Magnolia Power Project, with 100.0%. City of Burbank Water and Power-(CA) operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What does City of Burbank Water and Power charge homes?
City of Burbank Water and Power, the operator of Magnolia Power Project, had an average residential price of 21.50¢ per kWh and an average bill of $106 a month in 2025, 31% below the California average of 31.35¢.
| Measure | Price | Monthly bill | Against California |
|---|---|---|---|
| City of Burbank Water and Power | 21.50¢ | $106 | 31% lower |
| California average | 31.35¢ | $155 | |
| U.S. average | 17.23¢ | $151 | 45% lower |
Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.
Where is the Magnolia Power Project plant?
Magnolia Power Project is in Burbank, Los Angeles County, California, at 34.1786° N, 118.3153° W. It sits in the Los Angeles Department of Water and Power balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which natural gas plants in California are similar in size?
California has 304 operable natural gas plants with 40,211 MW of capacity, and Magnolia Power Project's 388 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Panoche Energy Center | Fresno | 432 | 760,356 |
| Watson Cogeneration | Los Angeles | 405 | 1,783,717 |
| Pio Pico Energy Center | San Diego | 395 | 46,864 |
| Magnolia Power Project | Los Angeles | 388 | 1,204,502 |
| El Centro Hybrid | Imperial | 358 | 1,093,177 |
| Tracy Combined Cycle Power Plant | San Joaquin | 336 | 896,191 |
| Los Esteros Critical Energy Center | Santa Clara | 306 | 156,503 |
Source: EIA Forms EIA-860 and EIA-923, 2025.