Natural gas power plant, California

Los Esteros Critical Energy Center, California

Los Esteros Critical Energy Center is a 306 MW natural gas power plant in Santa Clara County, California, operated by Los Esteros Critical Energy Facility LLC, and it generated 156,503 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in California, and its capacity factor sits at the 26th percentile of U.S. natural gas plants. By 2025 generation it ranks 2,838th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

306 MWNameplate capacity
6%Capacity factor, 2025, 26th percentile, on 300 MW net summer
0.1%Of CA generation, 2025
18 yearsAverage generator age, by MW

How hard does the Los Esteros Critical Energy Center plant run compared with other natural gas plants?

The Los Esteros Critical Energy Center plant had a capacity factor of 6% in 2025 on 300 MW of net summer capacity, the 26th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 22 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Los Esteros Critical Energy Center6%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Los Esteros Critical Energy Center plant generating more or less than last year?

Los Esteros Critical Energy Center generated 156,503 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 4.5% ahead of the same months of 2025. 2024 has output for only 11 months, so the two years are not compared.

Net generation by period
PeriodMWh
2024233,318
2025156,503
2026 through August108,028
2025, same months103,367
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202632,129
July 202613,303
June 20263,910
May 20268,558
April 202617,738
March 202617,934
February 2026232
January 202614,224
December 20256,182
November 202518,253
October 20252,739
September 202525,962
August 202550,625
July 20252,722
June 20251,993
May 20253,610
April 20250
March 202525,701
February 20259,057
January 20259,659
December 20240
November 20248,345
October 202432,724
September 202428,707
August 202428,566
July 202446,244
June 202415,096
May 202423,097
April 202420,594
March 20241,412
February 20244,443
January 202424,090

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Los Esteros Critical Energy Center plant?

Los Esteros Critical Energy Center made 0.1% of the 204,542,898 MWh reported by California plants in 2025, from 0.3% of the state's 107,433 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 71st largest of 1,877 plants in California, the 1,015th largest of 14,327 in the U.S. and the 603rd largest of 1,962 natural gas plants. By 2025 generation it is the 287th largest of 1,608 generating plants in the state.

Los Esteros Critical Energy Center within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)306107,4330.3%
Generation (MWh)156,503204,542,8980.1%
Natural gas capacity (MW)30640,2110.8%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Los Esteros Critical Energy Center plant, and when do they retire?

5 operable generators total 306 MW, with an average age of 18 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s418059%none reported
2010s112641%none reported
Every generator, 5 in all
UnitStatusTechnologyMWIn servicePlanned retirement
CTG1OperatingNatural Gas Fired Combined Cycle452003n/a
CTG2OperatingNatural Gas Fired Combined Cycle452003n/a
CTG3OperatingNatural Gas Fired Combined Cycle452003n/a
CTG4OperatingNatural Gas Fired Combined Cycle452003n/a
CAG5OperatingNatural Gas Fired Combined Cycle1262013n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Los Esteros Critical Energy Center plant?

EIA lists no joint owners for Los Esteros Critical Energy Center. Los Esteros Critical Energy Facility LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Los Esteros Critical Energy Center plant?

Los Esteros Critical Energy Center is in San Jose, Santa Clara County, California, at 37.4250° N, 121.9319° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in California are similar in size?

California has 304 operable natural gas plants with 40,211 MW of capacity, and Los Esteros Critical Energy Center's 306 MW is 1% of that.

Natural gas plants in California around this size
PlantCountyMW2025 MWh
Magnolia Power ProjectLos Angeles3881,204,502
El Centro HybridImperial3581,093,177
Tracy Combined Cycle Power PlantSan Joaquin336896,191
Los Esteros Critical Energy CenterSanta Clara306156,503
Walnut Energy CenterStanislaus3011,604,800
Kern River CogenerationKern300112,424
Sycamore CogenerationKern300197,249

Source: EIA Forms EIA-860 and EIA-923, 2025.