Solar power plant, Ohio
Fayette Solar power plant, Ohio
Fayette Solar is a 45 MW solar power plant in Ross County, Ohio, operated by Geronimo Power, and it generated 88,928 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Ohio, and its capacity factor sits at the 46th percentile of U.S. solar plants. By 2025 generation it ranks 3,525th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Fayette Solar plant run compared with other solar plants?
The Fayette Solar plant had a capacity factor of 23% in 2025 on 45 MW of net summer capacity, the 46th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 82 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Fayette Solar | 23% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Fayette Solar plant generating more or less than last year?
Fayette Solar generated 88,928 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 6.4% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | n/a |
| 2025 | 88,928 |
| 2026 through August | 69,958 |
| 2025, same months | 65,751 |
Monthly generation, Jan 2025 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 10,045 |
| July 2026 | 11,782 |
| June 2026 | 10,802 |
| May 2026 | 10,370 |
| April 2026 | 10,175 |
| March 2026 | 7,508 |
| February 2026 | 5,268 |
| January 2026 | 4,008 |
| December 2025 | 2,536 |
| November 2025 | 3,688 |
| October 2025 | 7,323 |
| September 2025 | 9,630 |
| August 2025 | 10,790 |
| July 2025 | 10,533 |
| June 2025 | 10,401 |
| May 2025 | 9,193 |
| April 2025 | 8,191 |
| March 2025 | 7,276 |
| February 2025 | 4,731 |
| January 2025 | 4,636 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Fayette Solar plant, and when do they retire?
1 operable generator totals 45 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 45 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| FYTSL | Operating | Solar Photovoltaic | 45 | 2025 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Fayette Solar plant?
EIA lists no joint owners for Fayette Solar. Geronimo Power operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Fayette Solar plant?
Fayette Solar is in Greenfield, Ross County, Ohio, at 39.3830° N, 83.4000° W. It sits in the PJM Interconnection, LLC balancing area (NERC region RFC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Ohio are similar in size?
Ohio has 73 operable solar plants with 4,481 MW of capacity, and Fayette Solar's 45 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Timber Road Solar Park | Paulding | 50 | 99,640 |
| Clinton Solar (OH) | Clinton | 50 | 5,038 |
| Great Bend Solar Project | Meigs | 48 | 2,654 |
| Fayette Solar | Ross | 45 | 88,928 |
Source: EIA Forms EIA-860 and EIA-923, 2025.