Timber Road Solar Park power plant, Ohio

Timber Road Solar Park is a 49.9 MW solar power plant in Paulding County, Ohio, operated by Timber Road Solar Park, and it generated 99,640 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Ohio, and its capacity factor sits at the 48th percentile of U.S. solar plants. By 2025 generation it ranks 3,396th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

49.9 MWNameplate capacity
23%Capacity factor, 2025, 48th percentile, on 49.9 MW net summer
0.1%Of OH generation, 2025
2 yearsAverage generator age, by MW

How hard does the Timber Road Solar Park plant run compared with other solar plants?

The Timber Road Solar Park plant had a capacity factor of 23% in 2025 on 49.9 MW of net summer capacity, the 48th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 83 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Timber Road Solar Park23%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Timber Road Solar Park plant generating more or less than last year?

Generation at Timber Road Solar Park fell 4.9% from 2024 to 2025, from 104,824 MWh to 99,640 MWh. Through August 2026 it is running 10.1% behind the same months of 2025.

Net generation by period
PeriodMWh
2024104,824
202599,640
2026 through August66,042
2025, same months73,460
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 20267,990
July 202610,812
June 202611,776
May 202611,710
April 20267,722
March 20266,925
February 20265,584
January 20263,523
December 20252,835
November 20253,776
October 20258,400
September 202511,169
August 202512,164
July 202512,512
June 202511,829
May 202510,213
April 20259,874
March 20257,978
February 20254,579
January 20254,311
December 20242,383
November 20243,665
October 20249,839
September 20249,935
August 202412,301
July 202413,273
June 202413,115
May 202412,787
April 202410,463
March 20247,974
February 20246,956
January 20242,133

Source: EIA Form EIA-923, through August 2026.

How much of Ohio's electricity comes from the Timber Road Solar Park plant?

Timber Road Solar Park made 0.1% of the 145,060,499 MWh reported by Ohio plants in 2025, from 0.1% of the state's 34,392 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 68th largest of 215 plants in Ohio, the 3,835th largest of 14,327 in the U.S. and the 925th largest of 7,223 solar plants. By 2025 generation it is the 65th largest of 187 generating plants in the state.

Timber Road Solar Park within Ohio, 2025
MeasureThis plantOhioShare
Capacity (MW)5034,3920.1%
Generation (MWh)99,640145,060,4990.1%
Solar capacity (MW)504,4811.1%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Timber Road Solar Park plant, and when do they retire?

1 operable generator totals 49.9 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s150100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GEN01OperatingSolar Photovoltaic502023n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Timber Road Solar Park plant?

EIA lists no joint owners for Timber Road Solar Park. Timber Road Solar Park operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Timber Road Solar Park plant?

Timber Road Solar Park is in Payne, Paulding County, Ohio, at 41.0923° N, 84.7257° W. It sits in the PJM Interconnection, LLC balancing area (NERC region RFC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Ohio are similar in size?

Ohio has 73 operable solar plants with 4,481 MW of capacity, and Timber Road Solar Park's 49.9 MW is 1% of that.

Solar plants in Ohio around this size
PlantCountyMW2025 MWh
Nestlewood SolarClermont80157,173
Salt City Solar Project - HybridRoss50103,713
Blue Harvest Solar ParkPutnam5099,534
Timber Road Solar ParkPaulding5099,640
Clinton Solar (OH)Clinton505,038
Great Bend Solar ProjectMeigs482,654