Solar power plant, Ohio
Salt City Solar Project-Hybrid power plant, Ohio
Salt City Solar Project-Hybrid is a 49.9 MW solar power plant in Ross County, Ohio, operated by Salt City Solar LLC, and it generated 103,713 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Ohio, and its capacity factor sits at the 55th percentile of U.S. solar plants. By 2025 generation it ranks 3,352nd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Salt City Solar Project-Hybrid plant run compared with other solar plants?
The Salt City Solar Project-Hybrid plant had a capacity factor of 24% in 2025 on 49.9 MW of net summer capacity, the 55th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 87 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Salt City Solar Project-Hybrid | 24% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Salt City Solar Project-Hybrid plant generating more or less than last year?
Generation at Salt City Solar Project-Hybrid rose 0.2% from 2024 to 2025, from 103,531 MWh to 103,713 MWh. Through August 2026 it is running 2.2% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 103,531 |
| 2025 | 103,713 |
| 2026 through August | 75,391 |
| 2025, same months | 77,055 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 10,160 |
| July 2026 | 12,397 |
| June 2026 | 11,786 |
| May 2026 | 11,205 |
| April 2026 | 11,116 |
| March 2026 | 7,980 |
| February 2026 | 6,395 |
| January 2026 | 4,352 |
| December 2025 | 2,453 |
| November 2025 | 4,498 |
| October 2025 | 8,630 |
| September 2025 | 11,077 |
| August 2025 | 13,264 |
| July 2025 | 12,557 |
| June 2025 | 12,314 |
| May 2025 | 9,910 |
| April 2025 | 9,622 |
| March 2025 | 8,879 |
| February 2025 | 5,335 |
| January 2025 | 5,174 |
| December 2024 | 3,551 |
| November 2024 | 4,319 |
| October 2024 | 9,092 |
| September 2024 | 9,639 |
| August 2024 | 12,290 |
| July 2024 | 12,907 |
| June 2024 | 12,248 |
| May 2024 | 11,490 |
| April 2024 | 10,084 |
| March 2024 | 8,584 |
| February 2024 | 6,605 |
| January 2024 | 2,722 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Salt City Solar Project-Hybrid plant, and when do they retire?
1 operable generator totals 49.9 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 50 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| SOLAR | Operating | Solar Photovoltaic | 50 | 2023 | n/a |
| BESS | Postponed indefinitely | Batteries | 13 | n/a | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Salt City Solar Project-Hybrid plant?
EIA lists no joint owners for Salt City Solar Project-Hybrid. Salt City Solar LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Salt City Solar Project-Hybrid plant?
Salt City Solar Project-Hybrid is in Circleville, Ross County, Ohio, at 39.4147° N, 82.9629° W. It sits in the PJM Interconnection, LLC balancing area (NERC region RFC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Ohio are similar in size?
Ohio has 73 operable solar plants with 4,481 MW of capacity, and Salt City Solar Project-Hybrid's 49.9 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Nestlewood Solar | Clermont | 80 | 157,173 |
| Salt City Solar Project - Hybrid | Ross | 50 | 103,713 |
| Blue Harvest Solar Park | Putnam | 50 | 99,534 |
| Timber Road Solar Park | Paulding | 50 | 99,640 |
| Clinton Solar (OH) | Clinton | 50 | 5,038 |
Source: EIA Forms EIA-860 and EIA-923, 2025.