Skip to main content
RateWatt

Solar power plant, Ohio

Blue Harvest Solar Park power plant, Ohio

Blue Harvest Solar Park is a 49.9 MW solar power plant in Putnam County, Ohio, operated by Blue Harvest Solar Park LLC, and it generated 99,534 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Ohio, and its capacity factor sits at the 47th percentile of U.S. solar plants. By 2025 generation it ranks 3,397th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

49.9 MWNameplate capacity
23%Capacity factor, 2025, 47th percentile, on 49.9 MW net summer
0.1%Of OH generation, 2025
2 yearsAverage generator age, by MW

How hard does the Blue Harvest Solar Park plant run compared with other solar plants?

The Blue Harvest Solar Park plant had a capacity factor of 23% in 2025 on 49.9 MW of net summer capacity, the 47th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 83 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Blue Harvest Solar Park23%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Blue Harvest Solar Park plant generating more or less than last year?

Generation at Blue Harvest Solar Park fell 5.9% from 2024 to 2025, from 105,759 MWh to 99,534 MWh. Through August 2026 it is running 4.6% behind the same months of 2025.

Net generation by period
PeriodMWh
2024105,759
202599,534
2026 through August70,893
2025, same months74,350
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 20269,655
July 202612,152
June 202612,153
May 202611,477
April 20268,724
March 20266,878
February 20265,972
January 20263,882
December 20252,348
November 20253,960
October 20257,924
September 202510,952
August 202512,654
July 202512,328
June 202511,541
May 202510,245
April 20259,992
March 20257,978
February 20254,579
January 20255,033
December 20242,496
November 20243,656
October 20249,921
September 202410,493
August 202412,207
July 202412,761
June 202413,484
May 202412,803
April 202410,099
March 20248,412
February 20246,863
January 20242,564

Source: EIA Form EIA-923, through August 2026.

How much of Ohio's electricity comes from the Blue Harvest Solar Park plant?

Blue Harvest Solar Park made 0.1% of the 145,060,499 MWh reported by Ohio plants in 2025, from 0.1% of the state's 34,392 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 68th largest of 215 plants in Ohio, the 3,835th largest of 14,327 in the U.S. and the 924th largest of 7,223 solar plants. By 2025 generation it is the 66th largest of 187 generating plants in the state.

Blue Harvest Solar Park within Ohio, 2025
MeasureThis plantOhioShare
Capacity (MW)5034,3920.1%
Generation (MWh)99,534145,060,4990.1%
Solar capacity (MW)504,4811.1%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Blue Harvest Solar Park plant, and when do they retire?

1 operable generator totals 49.9 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s150100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GEN01OperatingSolar Photovoltaic502023n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Blue Harvest Solar Park plant?

EIA lists no joint owners for Blue Harvest Solar Park. Blue Harvest Solar Park LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Blue Harvest Solar Park plant?

Blue Harvest Solar Park is in Continental, Putnam County, Ohio, at 41.0917° N, 84.2744° W. It sits in the PJM Interconnection, LLC balancing area (NERC region RFC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Ohio are similar in size?

Ohio has 73 operable solar plants with 4,481 MW of capacity, and Blue Harvest Solar Park's 49.9 MW is 1% of that.

Solar plants in Ohio around this size
PlantCountyMW2025 MWh
Nestlewood SolarClermont80157,173
Salt City Solar Project - HybridRoss50103,713
Blue Harvest Solar ParkPutnam5099,534
Timber Road Solar ParkPaulding5099,640
Clinton Solar (OH)Clinton505,038
Great Bend Solar ProjectMeigs482,654

Source: EIA Forms EIA-860 and EIA-923, 2025.