Biomass power plant, Florida

Fernandina Plant, Florida

Fernandina Plant is a 42 MW biomass power plant in Nassau County, Florida, operated by Rayonier Advanced Materials, and it generated 177,710 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Florida, and its capacity factor sits at the 38th percentile of U.S. biomass plants. By 2025 generation it ranks 2,670th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

42 MWNameplate capacity
41%Capacity factor, 2025, 38th percentile, on 42 MW net summer
0.1%Of FL generation, 2025
43 yearsAverage generator age, by MW

How hard does Fernandina Plant run compared with other biomass plants?

Fernandina Plant had a capacity factor of 41% in 2025 on 42 MW of net summer capacity, the 38th percentile of the 167 U.S. biomass plants with at least 20 MW. The typical biomass plant reached 48%. That equals about 149 days at full output out of 365.

0%Shaded: the middle half of biomass plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Fernandina Plant41%
Biomass plants, 75th percentile65%
Biomass plants, median48%
Biomass plants, 25th percentile35%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is Fernandina Plant generating more or less than last year?

Generation at Fernandina Plant fell 13.0% from 2024 to 2025, from 204,374 MWh to 177,710 MWh.

Net generation by period
PeriodMWh
2024204,374
2025177,710
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202517,047
November 202514,956
October 202517,781
September 202515,159
August 202514,744
July 202519,061
June 202516,161
May 202512,320
April 202512,150
March 20254,677
February 202514,963
January 202518,689
December 202418,144
November 202416,298
October 202420,838
September 202415,764
August 202416,180
July 202417,302
June 202414,061
May 202415,085
April 202418,540
March 202416,127
February 202416,309
January 202419,725

Source: EIA Form EIA-923, through August 2026.

How much of Florida's electricity comes from Fernandina Plant?

Fernandina Plant made 0.1% of the 267,867,735 MWh reported by Florida plants in 2025, from 0.1% of the state's 79,936 MW of capacity. Its share of output is 1.3 times its share of capacity. By capacity it is the 243rd largest of 331 plants in Florida, the 4,033rd largest of 14,327 in the U.S. and the 112th largest of 585 biomass plants. By 2025 generation it is the 103rd largest of 313 generating plants in the state.

Fernandina Plant within Florida, 2025
MeasureThis plantFloridaShare
Capacity (MW)4279,9360.1%
Generation (MWh)177,710267,867,7350.1%
Biomass capacity (MW)421,1443.7%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at Fernandina Plant, and when do they retire?

2 operable generators total 42 MW, with an average age of 43 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860. 2 have already retired, totalling 12.5 MW.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1950s12048%none reported
2010s12252%none reported
Every generator, 4 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GEN4OperatingWood/Wood Waste Biomass201950n/a
GEN5OperatingWood/Wood Waste Biomass222012n/a
GEN2RetiredPetroleum Liquids519392005
GEN3RetiredWood/Wood Waste Biomass819392012

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns Fernandina Plant?

EIA lists no joint owners for Fernandina Plant. Rayonier Advanced Materials operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is Fernandina Plant?

Fernandina Plant is in Fernandina Beach, Nassau County, Florida, at 30.6612° N, 81.4730° W. It sits in the JEA balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which biomass plants in Florida are similar in size?

Florida has 29 operable biomass plants with 1,144 MW of capacity, and Fernandina Plant's 42 MW is 4% of that.

Biomass plants in Florida around this size
PlantCountyMW2025 MWh
Lee County Solid Waste EnergyLee59135,096
Clewiston Sugar HouseHendry49260,932
Hillsborough County Resource RecoveryHillsborough4790,482
Fernandina PlantNassau42150,268
Pasco Cnty Solid Waste Resource RecoveryPasco3181,003
McKay Bay FacilityHillsborough2244,909

Source: EIA Forms EIA-860 and EIA-923, 2025.