Skip to main content
RateWatt

Biomass power plant, Florida

Clewiston Sugar House biomass power plant, Florida

Clewiston Sugar House is a 49 MW biomass power plant in Hendry County, Florida, operated by United States Sugar Corp, and it generated 261,568 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Florida, and its capacity factor sits at the 77th percentile of U.S. biomass plants. By 2025 generation it ranks 2,156th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

49 MWNameplate capacity
67%Capacity factor, 2025, 77th percentile, on 44.6 MW net summer
0.1%Of FL generation, 2025
19 yearsAverage generator age, by MW

How hard does the Clewiston Sugar House plant run compared with other biomass plants?

The Clewiston Sugar House plant had a capacity factor of 67% in 2025 on 44.6 MW of net summer capacity, the 77th percentile of the 167 U.S. biomass plants with at least 20 MW. The typical biomass plant reached 48%. That equals about 244 days at full output out of 365.

0%Shaded: the middle half of biomass plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Clewiston Sugar House67%
Biomass plants, 75th percentile65%
Biomass plants, median48%
Biomass plants, 25th percentile35%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Clewiston Sugar House plant generating more or less than last year?

Generation at Clewiston Sugar House fell 3.6% from 2024 to 2025, from 271,326 MWh to 261,568 MWh. Through August 2026 it is running 10.7% behind the same months of 2025.

Net generation by period
PeriodMWh
2024271,326
2025261,568
2026 through August151,388
2025, same months169,592
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202612,889
July 202612,545
June 20269,820
May 202617,375
April 202623,615
March 202625,434
February 202622,784
January 202626,926
December 202526,871
November 202524,372
October 202527,988
September 202512,745
August 202515,039
July 202514,033
June 202510,239
May 202523,484
April 202526,995
March 202528,003
February 202525,216
January 202526,583
December 202426,387
November 202428,060
October 202423,416
September 202412,606
August 202415,821
July 202415,081
June 202412,006
May 202428,676
April 202427,597
March 202427,345
February 202425,941
January 202428,390

Source: EIA Form EIA-923, through August 2026.

How much of Florida's electricity comes from the Clewiston Sugar House plant?

Clewiston Sugar House made 0.1% of the 267,867,735 MWh reported by Florida plants in 2025, from 0.1% of the state's 79,936 MW of capacity. Its share of output is 1.6 times its share of capacity. By capacity it is the 237th largest of 331 plants in Florida, the 3,879th largest of 14,327 in the U.S. and the 95th largest of 585 biomass plants. By 2025 generation it is the 60th largest of 313 generating plants in the state.

Clewiston Sugar House within Florida, 2025
MeasureThis plantFloridaShare
Capacity (MW)4979,9360.1%
Generation (MWh)261,568267,867,7350.1%
Biomass capacity (MW)491,1444.3%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Clewiston Sugar House plant, and when do they retire?

3 operable generators total 49 MW, with an average age of 19 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860. 7 have already retired, totalling 41.2 MW.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s349100%none reported
Every generator, 10 in all
UnitStatusTechnologyMWIn servicePlanned retirement
TG6OperatingOther Waste Biomass152004n/a
TG7OperatingOther Waste Biomass202006n/a
TG8OperatingOther Waste Biomass142007n/a
TG2RetiredOther Waste Biomass419452004
TG1RetiredOther Waste Biomass519782004
TG3RetiredOther Waste Biomass319812007
TG4RetiredOther Waste Biomass619832007
DGNRetiredPetroleum Liquids119872006
DGSRetiredPetroleum Liquids119872006
TG5RetiredOther Waste Biomass2219972017

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Clewiston Sugar House plant?

EIA lists no joint owners for Clewiston Sugar House. United States Sugar Corp operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Clewiston Sugar House plant?

Clewiston Sugar House is in Clewiston, Hendry County, Florida, at 26.7351° N, 80.9377° W. It sits in the Progress Energy Florida balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which biomass plants in Florida are similar in size?

Florida has 29 operable biomass plants with 1,144 MW of capacity, and Clewiston Sugar House's 49 MW is 4% of that.

Biomass plants in Florida around this size
PlantCountyMW2025 MWh
Wheelabrator South BrowardBroward66202,088
Palm Beach Renewable Energy Facility 1Palm Beach62154,423
Lee County Solid Waste EnergyLee59135,096
Clewiston Sugar HouseHendry49260,932
Hillsborough County Resource RecoveryHillsborough4790,482
Fernandina PlantNassau42150,268
Pasco Cnty Solid Waste Resource RecoveryPasco3181,003

Source: EIA Forms EIA-860 and EIA-923, 2025.