Skip to main content
RateWatt

Biomass power plant, Florida

Wheelabrator South Broward biomass power plant, Florida

Wheelabrator South Broward is a 66 MW biomass power plant in Broward County, Florida, operated by FCC Environmental, and it generated 449,092 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Florida, and its capacity factor sits at the 43rd percentile of U.S. biomass plants. By 2025 generation it ranks 1,455th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

66 MWNameplate capacity
43%Capacity factor, 2025, 43rd percentile, on 54 MW net summer
0.2%Of FL generation, 2025
34 yearsAverage generator age, by MW

How hard does the Wheelabrator South Broward plant run compared with other biomass plants?

The Wheelabrator South Broward plant had a capacity factor of 43% in 2025 on 54 MW of net summer capacity, the 43rd percentile of the 167 U.S. biomass plants with at least 20 MW. The typical biomass plant reached 48%. That equals about 156 days at full output out of 365.

0%Shaded: the middle half of biomass plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Wheelabrator South Broward43%
Biomass plants, 75th percentile65%
Biomass plants, median48%
Biomass plants, 25th percentile35%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Wheelabrator South Broward plant generating more or less than last year?

Generation at Wheelabrator South Broward rose 8.0% from 2024 to 2025, from 415,969 MWh to 449,092 MWh. Through August 2026 it is running 2.8% behind the same months of 2025.

Net generation by period
PeriodMWh
2024415,969
2025449,092
2026 through August291,328
2025, same months299,621
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202633,460
July 202639,013
June 202638,390
May 202640,634
April 202627,729
March 202637,614
February 202634,636
January 202639,852
December 202539,866
November 202539,741
October 202533,879
September 202535,985
August 202537,634
July 202540,655
June 202539,863
May 202540,129
April 202534,827
March 202534,532
February 202533,547
January 202538,434
December 202439,173
November 202441,413
October 202438,630
September 202437,927
August 202435,922
July 202440,624
June 202431,630
May 202420,734
April 202421,495
March 202437,545
February 202434,547
January 202436,329

Source: EIA Form EIA-923, through August 2026.

How much of Florida's electricity comes from the Wheelabrator South Broward plant?

Wheelabrator South Broward made 0.2% of the 267,867,735 MWh reported by Florida plants in 2025, from 0.1% of the state's 79,936 MW of capacity. Its share of output is 2.0 times its share of capacity. By capacity it is the 221st largest of 331 plants in Florida, the 3,413th largest of 14,327 in the U.S. and the 58th largest of 585 biomass plants. By 2025 generation it is the 47th largest of 313 generating plants in the state.

Wheelabrator South Broward within Florida, 2025
MeasureThis plantFloridaShare
Capacity (MW)6679,9360.1%
Generation (MWh)449,092267,867,7350.2%
Biomass capacity (MW)661,1445.8%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Wheelabrator South Broward plant, and when do they retire?

1 operable generator totals 66 MW, with an average age of 34 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1990s166100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GEN1OperatingMunicipal Solid Waste661991n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Wheelabrator South Broward plant?

EIA lists no joint owners for Wheelabrator South Broward. FCC Environmental operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Wheelabrator South Broward plant?

Wheelabrator South Broward is in Ft. Lauderdale, Broward County, Florida, at 26.0687° N, 80.1986° W. It sits in the Florida Power & Light Company balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which biomass plants in Florida are similar in size?

Florida has 29 operable biomass plants with 1,144 MW of capacity, and Wheelabrator South Broward's 66 MW is 6% of that.

Biomass plants in Florida around this size
PlantCountyMW2025 MWh
International Paper PensacolaEscambia83317,356
Georgia-Pacific Palatka OperationsPutnam80192,501
Pinellas County Resource RecoveryPinellas77152,565
Wheelabrator South BrowardBroward66202,088
Palm Beach Renewable Energy Facility 1Palm Beach62154,423
Lee County Solid Waste EnergyLee59135,096
Clewiston Sugar HouseHendry49260,932

Source: EIA Forms EIA-860 and EIA-923, 2025.