Palm Beach Renewable Energy Facility 1 biomass power plant, Florida

Palm Beach Renewable Energy Facility 1 is a 62.3 MW biomass power plant in Palm Beach County, Florida, operated by Solid Waste Authority of Palm Beach Co, and it generated 344,664 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Florida, and its capacity factor sits at the 26th percentile of U.S. biomass plants. By 2025 generation it ranks 1,793rd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

62.3 MWNameplate capacity
35%Capacity factor, 2025, 26th percentile, on 50 MW net summer
0.1%Of FL generation, 2025
36 yearsAverage generator age, by MW

How hard does the Palm Beach Renewable Energy Facility 1 plant run compared with other biomass plants?

The Palm Beach Renewable Energy Facility 1 plant had a capacity factor of 35% in 2025 on 50 MW of net summer capacity, the 26th percentile of the 167 U.S. biomass plants with at least 20 MW. The typical biomass plant reached 48%. That equals about 129 days at full output out of 365.

0%Shaded: the middle half of biomass plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Palm Beach Renewable Energy Facility 135%
Biomass plants, 75th percentile65%
Biomass plants, median48%
Biomass plants, 25th percentile35%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Palm Beach Renewable Energy Facility 1 plant generating more or less than last year?

Generation at Palm Beach Renewable Energy Facility 1 rose 10.5% from 2024 to 2025, from 311,923 MWh to 344,664 MWh. Through August 2026 it is running 0.4% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024311,923
2025344,664
2026 through August234,640
2025, same months233,680
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202630,915
July 202628,801
June 202630,606
May 202632,375
April 202632,611
March 202622,159
February 202626,469
January 202630,704
December 202532,588
November 202520,398
October 202530,306
September 202527,692
August 202531,285
July 202529,246
June 202530,282
May 202533,577
April 202533,232
March 202521,507
February 202530,533
January 202524,018
December 202426,822
November 202431,376
October 202415,820
September 202425,074
August 202430,956
July 202437,139
June 202428,247
May 202431,721
April 202421,537
March 20242,045
February 202429,236
January 202431,950

Source: EIA Form EIA-923, through August 2026.

How much of Florida's electricity comes from the Palm Beach Renewable Energy Facility 1 plant?

Palm Beach Renewable Energy Facility 1 made 0.1% of the 267,867,735 MWh reported by Florida plants in 2025, from 0.1% of the state's 79,936 MW of capacity. Its share of output is 1.7 times its share of capacity. By capacity it is the 222nd largest of 331 plants in Florida, the 3,476th largest of 14,327 in the U.S. and the 64th largest of 585 biomass plants. By 2025 generation it is the 53rd largest of 313 generating plants in the state.

Palm Beach Renewable Energy Facility 1 within Florida, 2025
MeasureThis plantFloridaShare
Capacity (MW)6279,9360.1%
Generation (MWh)344,664267,867,7350.1%
Biomass capacity (MW)621,1445.4%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Palm Beach Renewable Energy Facility 1 plant, and when do they retire?

1 operable generator totals 62.3 MW, with an average age of 36 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1980s162100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GEN1OperatingMunicipal Solid Waste621989n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Palm Beach Renewable Energy Facility 1 plant?

EIA lists no joint owners for Palm Beach Renewable Energy Facility 1. Solid Waste Authority of Palm Beach Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Palm Beach Renewable Energy Facility 1 plant?

Palm Beach Renewable Energy Facility 1 is in West Palm Beach, Palm Beach County, Florida, at 26.7714° N, 80.1419° W. It sits in the Florida Power & Light Company balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which biomass plants in Florida are similar in size?

Florida has 29 operable biomass plants with 1,144 MW of capacity, and Palm Beach Renewable Energy Facility 1's 62.3 MW is 5% of that.

Biomass plants in Florida around this size
PlantCountyMW2025 MWh
Georgia-Pacific Palatka OperationsPutnam80192,501
Pinellas County Resource RecoveryPinellas77152,565
Wheelabrator South BrowardBroward66202,088
Palm Beach Renewable Energy Facility 1Palm Beach62154,423
Lee County Solid Waste EnergyLee59135,096
Clewiston Sugar HouseHendry49260,932
Hillsborough County Resource RecoveryHillsborough4790,482

Source: EIA Forms EIA-860 and EIA-923, 2025.