Pinellas County Resource Recovery is a 76.5 MW biomass power plant in Pinellas County, Florida, operated by Reworld Projects, LLC, and it generated 339,033 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Florida, and its capacity factor sits at the 20th percentile of U.S. biomass plants. By 2025 generation it ranks 1,813th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

76.5 MWNameplate capacity
30%Capacity factor, 2025, 20th percentile, on 58.1 MW net summer
0.1%Of FL generation, 2025
41 yearsAverage generator age, by MW

How hard does the Pinellas County Resource Recovery plant run compared with other biomass plants?

The Pinellas County Resource Recovery plant had a capacity factor of 30% in 2025 on 58.1 MW of net summer capacity, the 20th percentile of the 167 U.S. biomass plants with at least 20 MW. The typical biomass plant reached 48%. That equals about 109 days at full output out of 365.

0%Shaded: the middle half of biomass plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Pinellas County Resource Recovery30%
Biomass plants, 75th percentile65%
Biomass plants, median48%
Biomass plants, 25th percentile35%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Pinellas County Resource Recovery plant generating more or less than last year?

Generation at Pinellas County Resource Recovery fell 9.2% from 2024 to 2025, from 373,469 MWh to 339,033 MWh. Through August 2026 it is running 73.6% behind the same months of 2025.

Net generation by period
PeriodMWh
2024373,469
2025339,033
2026 through August66,148
2025, same months250,862
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 20265,363
July 20268,793
June 20268,316
May 202611,178
April 20267,281
March 202610,622
February 20264,727
January 20269,868
December 202510,260
November 202523,501
October 202525,776
September 202528,634
August 202527,560
July 202529,960
June 202533,110
May 202515,327
April 202533,640
March 202540,271
February 202535,503
January 202535,491
December 202415,252
November 202417,190
October 202430,397
September 202430,075
August 202437,880
July 202441,176
June 202439,586
May 202430,821
April 202430,083
March 202420,653
February 202438,871
January 202441,485

Source: EIA Form EIA-923, through August 2026.

How much of Florida's electricity comes from the Pinellas County Resource Recovery plant?

Pinellas County Resource Recovery made 0.1% of the 267,867,735 MWh reported by Florida plants in 2025, from 0.1% of the state's 79,936 MW of capacity. Its share of output is 1.3 times its share of capacity. By capacity it is the 81st largest of 331 plants in Florida, the 3,089th largest of 14,327 in the U.S. and the 38th largest of 585 biomass plants. By 2025 generation it is the 54th largest of 313 generating plants in the state.

Pinellas County Resource Recovery within Florida, 2025
MeasureThis plantFloridaShare
Capacity (MW)7779,9360.1%
Generation (MWh)339,033267,867,7350.1%
Biomass capacity (MW)771,1446.7%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Pinellas County Resource Recovery plant, and when do they retire?

2 operable generators total 76.5 MW, with an average age of 41 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1980s277100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GEN1OperatingMunicipal Solid Waste511983n/a
GEN2OperatingMunicipal Solid Waste261986n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Pinellas County Resource Recovery plant?

Pinellas County is the only joint owner reported for Pinellas County Resource Recovery, with 100.0%. Reworld Projects, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Pinellas County Resource Recovery plant?

Pinellas County Resource Recovery is in St. Petersburg, Pinellas County, Florida, at 27.8733° N, 82.6741° W. It sits in the Progress Energy Florida balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which biomass plants in Florida are similar in size?

Florida has 29 operable biomass plants with 1,144 MW of capacity, and Pinellas County Resource Recovery's 76.5 MW is 7% of that.

Biomass plants in Florida around this size
PlantCountyMW2025 MWh
Palm Beach Renewable Energy Facility 2Palm Beach96233,777
International Paper PensacolaEscambia83317,356
Georgia-Pacific Palatka OperationsPutnam80192,501
Pinellas County Resource RecoveryPinellas77152,565
Wheelabrator South BrowardBroward66202,088
Palm Beach Renewable Energy Facility 1Palm Beach62154,423
Lee County Solid Waste EnergyLee59135,096

Source: EIA Forms EIA-860 and EIA-923, 2025.