Biomass power plant, Florida

Lee County Solid Waste Energy biomass power plant, Florida

Lee County Solid Waste Energy is a 59 MW biomass power plant in Lee County, Florida, operated by Lee County Board-Commissioners, and it generated 302,436 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Florida, and its capacity factor sits at the 16th percentile of U.S. biomass plants. By 2025 generation it ranks 1,961st of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

59 MWNameplate capacity
28%Capacity factor, 2025, 16th percentile, on 55 MW net summer
0.1%Of FL generation, 2025
27 yearsAverage generator age, by MW

How hard does the Lee County Solid Waste Energy plant run compared with other biomass plants?

The Lee County Solid Waste Energy plant had a capacity factor of 28% in 2025 on 55 MW of net summer capacity, the 16th percentile of the 167 U.S. biomass plants with at least 20 MW. The typical biomass plant reached 48%. That equals about 102 days at full output out of 365.

0%Shaded: the middle half of biomass plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Lee County Solid Waste Energy28%
Biomass plants, 75th percentile65%
Biomass plants, median48%
Biomass plants, 25th percentile35%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Lee County Solid Waste Energy plant generating more or less than last year?

Generation at Lee County Solid Waste Energy rose 34.5% from 2024 to 2025, from 224,800 MWh to 302,436 MWh. Through August 2026 it is running 5.8% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024224,800
2025302,436
2026 through August220,656
2025, same months208,504
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202628,796
July 202629,739
June 202625,262
May 202622,896
April 202629,795
March 202630,909
February 202628,046
January 202625,213
December 202514,057
November 202527,185
October 202526,087
September 202526,603
August 202529,291
July 202527,562
June 202527,766
May 202526,652
April 202528,506
March 202526,161
February 202519,554
January 202523,012
December 202428,458
November 202422,743
October 202414,431
September 202415,985
August 202422,052
July 202422,364
June 202422,994
May 202422,894
April 202425,532
March 20248,517
February 20246,214
January 202412,616

Source: EIA Form EIA-923, through August 2026.

How much of Florida's electricity comes from the Lee County Solid Waste Energy plant?

Lee County Solid Waste Energy made 0.1% of the 267,867,735 MWh reported by Florida plants in 2025, from 0.1% of the state's 79,936 MW of capacity. Its share of output is 1.5 times its share of capacity. By capacity it is the 228th largest of 331 plants in Florida, the 3,569th largest of 14,327 in the U.S. and the 69th largest of 585 biomass plants. By 2025 generation it is the 57th largest of 313 generating plants in the state.

Lee County Solid Waste Energy within Florida, 2025
MeasureThis plantFloridaShare
Capacity (MW)5979,9360.1%
Generation (MWh)302,436267,867,7350.1%
Biomass capacity (MW)591,1445.2%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Lee County Solid Waste Energy plant, and when do they retire?

2 operable generators total 59 MW, with an average age of 27 years weighted by capacity at the end of 2025. 59 MW, 100% of operable capacity, has a planned retirement, the first in 2029.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1990s13966%2029
2000s12034%2072
Capacity retiring by year
YearUnitsMW retiringShare of plant
202913966%
207212034%
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GEN1OperatingMunicipal Solid Waste3919942029
GEN2OperatingMunicipal Solid Waste2020072072

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Lee County Solid Waste Energy plant?

EIA lists no joint owners for Lee County Solid Waste Energy. Lee County Board-Commissioners operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Lee County Solid Waste Energy plant?

Lee County Solid Waste Energy is in Fort Myers, Lee County, Florida, at 26.6315° N, 81.7607° W. It sits in the Florida Power & Light Company balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which biomass plants in Florida are similar in size?

Florida has 29 operable biomass plants with 1,144 MW of capacity, and Lee County Solid Waste Energy's 59 MW is 5% of that.

Biomass plants in Florida around this size
PlantCountyMW2025 MWh
Pinellas County Resource RecoveryPinellas77152,565
Wheelabrator South BrowardBroward66202,088
Palm Beach Renewable Energy Facility 1Palm Beach62154,423
Lee County Solid Waste EnergyLee59135,096
Clewiston Sugar HouseHendry49260,932
Hillsborough County Resource RecoveryHillsborough4790,482
Fernandina PlantNassau42150,268

Source: EIA Forms EIA-860 and EIA-923, 2025.