Skip to main content
RateWatt

Solar power plant, Mississippi

Golden Triangle II solar power plant, Mississippi

Golden Triangle II is a 200 MW power plant, 150 MW of it solar, in Lowndes County, Mississippi, operated by Origis Energy USA, Inc, and it generated 319,334 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.4% of the generation reported in Mississippi, and its capacity factor sits at the 63rd percentile of U.S. solar plants. By 2025 generation it ranks 1,889th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

200 MWNameplate capacity
25%Capacity factor, 2025, solar units, 63rd percentile, on 150 MW net summer
0.4%Of MS generation, 2025
1 yearAverage generator age, by MW

How hard does the Golden Triangle II plant run compared with other solar plants?

The Golden Triangle II plant's solar units had a capacity factor of 25% in 2025 on 150 MW of net summer capacity, the 63rd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 90 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Golden Triangle II25%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the Golden Triangle II plant generating more or less than last year?

Golden Triangle II generated 319,334 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 6.6% behind the same months of 2025. 2024 has output for only 8 months, so the two years are not compared.

Net generation by period
PeriodMWh
2024201,019
2025319,334
2026 through August212,042
2025, same months227,033
Monthly generation, May 2024 to Aug 2026
MonthMWh
August 20262,442
July 202636,634
June 202634,118
May 202632,994
April 202636,082
March 202631,385
February 202620,860
January 202617,527
December 202515,658
November 202521,125
October 202525,139
September 202530,379
August 202532,732
July 202535,340
June 202532,592
May 202529,737
April 202532,235
March 202526,319
February 202518,708
January 202519,370
December 202416,275
November 202417,612
October 202430,986
September 202421,196
August 202432,806
July 202433,646
June 202436,932
May 202411,566

Source: EIA Form EIA-923, through August 2026.

How much of Mississippi's electricity comes from the Golden Triangle II plant?

Golden Triangle II made 0.4% of the 77,727,245 MWh reported by Mississippi plants in 2025, from 1.1% of the state's 17,862 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 21st largest of 63 plants in Mississippi, the 1,524th largest of 14,327 in the U.S. and the 281st largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 24th largest of 57 generating plants in the state.

Golden Triangle II within Mississippi, 2025
MeasureThis plantMississippiShare
Capacity (MW)20017,8621.1%
Generation (MWh)319,33477,727,2450.4%
Solar capacity (MW)1501,5249.8%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Golden Triangle II plant, and when do they retire?

2 operable generators total 200 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s2200100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
MS6_SOperatingBatteries502024n/a
OEMS6OperatingSolar Photovoltaic1502024n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Golden Triangle II plant?

EIA lists no joint owners for Golden Triangle II. Origis Energy USA, Inc operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Golden Triangle II plant use?

Golden Triangle II has capacity on 2 fuels: 75% solar and 25% battery and pumped storage. In 2025, solar made 102% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar15075.0%325,338
Battery and pumped storage5025.0%-6,004

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Golden Triangle II plant?

Golden Triangle II is in St.Artesia, Lowndes County, Mississippi, at 33.4155° N, 88.6223° W. It sits in the Tennessee Valley Authority balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Mississippi are similar in size?

Mississippi has 25 operable solar plants with 1,524 MW of capacity, and Golden Triangle II's 150 MW is 10% of that.

Solar plants in Mississippi around this size
PlantCountyMW2025 MWh
Golden TriangleLowndes200418,711
Pearl River Solar Park LLCScott175418,916
Golden Triangle IILowndes150325,338
Sunflower CountySunflower100154,825
Ragsdale Solar LLCMadison100238,898
Wildflower Solar, LLC (MS)DeSoto100201,326

Source: EIA Forms EIA-860 and EIA-923, 2025.