Solar power plant, Mississippi
Golden Triangle II solar power plant, Mississippi
Golden Triangle II is a 200 MW power plant, 150 MW of it solar, in Lowndes County, Mississippi, operated by Origis Energy USA, Inc, and it generated 319,334 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.4% of the generation reported in Mississippi, and its capacity factor sits at the 63rd percentile of U.S. solar plants. By 2025 generation it ranks 1,889th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Golden Triangle II plant run compared with other solar plants?
The Golden Triangle II plant's solar units had a capacity factor of 25% in 2025 on 150 MW of net summer capacity, the 63rd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 90 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Golden Triangle II | 25% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.
Is the Golden Triangle II plant generating more or less than last year?
Golden Triangle II generated 319,334 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 6.6% behind the same months of 2025. 2024 has output for only 8 months, so the two years are not compared.
| Period | MWh |
|---|---|
| 2024 | 201,019 |
| 2025 | 319,334 |
| 2026 through August | 212,042 |
| 2025, same months | 227,033 |
Monthly generation, May 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 2,442 |
| July 2026 | 36,634 |
| June 2026 | 34,118 |
| May 2026 | 32,994 |
| April 2026 | 36,082 |
| March 2026 | 31,385 |
| February 2026 | 20,860 |
| January 2026 | 17,527 |
| December 2025 | 15,658 |
| November 2025 | 21,125 |
| October 2025 | 25,139 |
| September 2025 | 30,379 |
| August 2025 | 32,732 |
| July 2025 | 35,340 |
| June 2025 | 32,592 |
| May 2025 | 29,737 |
| April 2025 | 32,235 |
| March 2025 | 26,319 |
| February 2025 | 18,708 |
| January 2025 | 19,370 |
| December 2024 | 16,275 |
| November 2024 | 17,612 |
| October 2024 | 30,986 |
| September 2024 | 21,196 |
| August 2024 | 32,806 |
| July 2024 | 33,646 |
| June 2024 | 36,932 |
| May 2024 | 11,566 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Golden Triangle II plant, and when do they retire?
2 operable generators total 200 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 2 | 200 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| MS6_S | Operating | Batteries | 50 | 2024 | n/a |
| OEMS6 | Operating | Solar Photovoltaic | 150 | 2024 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Golden Triangle II plant?
EIA lists no joint owners for Golden Triangle II. Origis Energy USA, Inc operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What fuels does the Golden Triangle II plant use?
Golden Triangle II has capacity on 2 fuels: 75% solar and 25% battery and pumped storage. In 2025, solar made 102% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Solar | 150 | 75.0% | 325,338 |
| Battery and pumped storage | 50 | 25.0% | -6,004 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is the Golden Triangle II plant?
Golden Triangle II is in St.Artesia, Lowndes County, Mississippi, at 33.4155° N, 88.6223° W. It sits in the Tennessee Valley Authority balancing area (NERC region SERC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Mississippi are similar in size?
Mississippi has 25 operable solar plants with 1,524 MW of capacity, and Golden Triangle II's 150 MW is 10% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Golden Triangle | Lowndes | 200 | 418,711 |
| Pearl River Solar Park LLC | Scott | 175 | 418,916 |
| Golden Triangle II | Lowndes | 150 | 325,338 |
| Sunflower County | Sunflower | 100 | 154,825 |
| Ragsdale Solar LLC | Madison | 100 | 238,898 |
| Wildflower Solar, LLC (MS) | DeSoto | 100 | 201,326 |
Source: EIA Forms EIA-860 and EIA-923, 2025.